Home / Europe / Serbia / Food & beverage plants / Secerana Jedinstvo

Secerana Jedinstvo

Food & Beverage in Serbia. Approximate location 45.08582, 20.63493.

Food & BeverageSerbiaCO₂ reported

Secerana Jedinstvo is a food & beverage plant in Serbia with a reported capacity of 708,750,000 USD. It processes food, beverages or tobacco — typically with boilers, cookers and dryers. By capacity it ranks #11 of 12 food & beverage plants tracked in Serbia. It emits about 30,388 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 7,083 cars. Its CO₂ per unit of capacity is about 47% below the median food & beverage plant.

708,750,000USD
30,388t CO₂e / yr (Climate TRACE)
#17CO₂ rank in Serbia
0.00t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-38480848.

Bağlamda: bu tesis nasıl karşılaştırılır

708,750,000 USD'de, Secerana Jedinstvo Serbia'daki food & beverage plant'lerin medyanı yaklaşık 708,750,000 USD'dir. Alt sektör: food-beverage-tobacco. food & beverage plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 80–200°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Gıda ve içecek fabrikaları, sürekli çalışan kazanlar, pişiriciler, pastörizatörler ve kurutucular kullanır; izolasyon yapılmamış borulardan ve kaplardan ısı kaybı doğrudan çıktı ve verimliliği azaltır.

Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.

What 30,388 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

7,083cars driven for a year
3,963homes' annual energy use
506,467tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest food & beverage plants in Serbia

Victoriaoil Doo Šid: 708,750,000 USD708.8MVictoriaoi…Proizvodni Centar Vrbas: 708,750,000 USD708.8MProizvodni…Proizvodni Centar Pećinci: 708,750,000 USD708.8MProizvodni…Fabrika Secera Crvenka: 708,750,000 USD708.8MFabrika Se…Fabrika Secera Te-To Senta: 708,750,000 USD708.8MFabrika Se…Sojaprotein: 708,750,000 USD708.8MSojaproteinFabrika Šećera Crvenka: 708,750,000 USD708.8MFabrika Še…Sojaprotein: 708,750,000 USD708.8MSojaprotein

Reported capacity (USD), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Secerana Jedinstvo sits in a humid subtropical climate zone (Köppen Cfa), at 45.1°N in the northern hemisphere.

~18°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #11 largest of 12 food & beverage plants in Serbia by reported capacity.

Nearby industrial sites

Location

Coordinates 45.08582, 20.63493. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Secerana Jedinstvo?

Secerana Jedinstvo is a food & beverage plant in Serbia. It processes food, beverages or tobacco — typically with boilers, cookers and dryers.

What is the capacity of Secerana Jedinstvo?

Secerana Jedinstvo has a reported capacity of 708,750,000 USD.

How much CO₂ does Secerana Jedinstvo emit?

Secerana Jedinstvo emits about 30,388 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 7,083 cars. That ranks #17 among tracked facilities in Serbia.

Where is Secerana Jedinstvo located?

Secerana Jedinstvo is in Serbia, near coordinates 45.08582, 20.63493.

Built from open public data; no personal information. Operate this site? Request a correction or removal.