Home / Asia / Saudi Arabia / Steel plants / SABIC Hadeed Al Jubail steel plant

SABIC Hadeed Al Jubail steel plant

Steel Plant in Saudi Arabia. Approximate location 27.01809, 49.57932.

Steel PlantSaudi ArabiaCO₂ reported

SABIC Hadeed Al Jubail steel plant is a steel plant in Saudi Arabia with a reported capacity of 6,000,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Saudi Iron and Steel Co. By capacity it ranks #1 of 6 steel plants tracked in Saudi Arabia. It emits about 3,619,273 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 843,653 cars. Its CO₂ per unit of capacity is about 12% above the median steel plant.

6,000,000t of steel
3,619,273t CO₂e / yr (Climate TRACE)
#6CO₂ rank in Saudi Arabia
0.60t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567040.

Bağlamda: bu tesis nasıl karşılaştırılır

6,000,000 t of steel'de, SABIC Hadeed Al Jubail steel plant Saudi Arabia'daki steel plant'lerin medyanı çok üstünde 1,200,000 t of steel'dir. Kapasite başına CO₂'si steel plant'nin medyanı üstünde kabaca 11%'dir. Alt sektör: iron-and-steel. steel plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1500°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çelik fabrikaları yüksek ocaklarda kömür yakar veya hurda ergitmek için elektrik ark kullanır; her iki durumda da eritilmiş metal 1.500°C'nin üstünde tutulmalı ve geniş sıcak borular ve kaplar aracılığıyla aktarılmalıdır.

Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.

What 3,619,273 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

843,653cars driven for a year
471,997homes' annual energy use
60,321,217tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Saudi Arabia

SABIC Hadeed Al Jubail steel plant: 6,000,000 t of steel6.0MSABIC Hade…Al Ittefaq Arab Steel Dammam plant: 2,600,000 t of steel2.6MAl Ittefaq…Solb Steel Jizan plant: 1,200,000 t of steel1.2MSolb Steel…Al Ittefaq National Steel Dammam plant: 1,000,000 t of steel1000kAl Ittefaq…Rajhi Al Assemah Steel Jeddah plant: 850,000 t of steel850kRajhi Al A…Al Qaryan steel plant: 700,000 t of steel700kAl Qaryan …

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Saudi Iron and Steel Co. All facilities by this operator →

Local climate

SABIC Hadeed Al Jubail steel plant sits in a hot desert climate zone (Köppen BWh), at 27.0°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #1 largest of 6 steel plants in Saudi Arabia by reported capacity.

Nearby industrial sites

Location

Coordinates 27.01809, 49.57932. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is SABIC Hadeed Al Jubail steel plant?

SABIC Hadeed Al Jubail steel plant is a steel plant in Saudi Arabia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of SABIC Hadeed Al Jubail steel plant?

SABIC Hadeed Al Jubail steel plant has a reported capacity of 6,000,000 t of steel.

How much CO₂ does SABIC Hadeed Al Jubail steel plant emit?

SABIC Hadeed Al Jubail steel plant emits about 3,619,273 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 843,653 cars. That ranks #6 among tracked facilities in Saudi Arabia.

Where is SABIC Hadeed Al Jubail steel plant located?

SABIC Hadeed Al Jubail steel plant is in Saudi Arabia, near coordinates 27.01809, 49.57932.

Who operates SABIC Hadeed Al Jubail steel plant?

SABIC Hadeed Al Jubail steel plant is operated by Saudi Iron and Steel Co.

Built from open public data; no personal information. Operate this site? Request a correction or removal.