Home / Asia / Bhutan / Cement plants / Penden Cement Gomtu Cement Plant

Penden Cement Gomtu Cement Plant

Cement Plant in Bhutan. Approximate location 26.81664, 89.18801.

Cement PlantBhutanCO₂ reported

Penden Cement Gomtu Cement Plant is a cement plant in Bhutan with a reported capacity of 602,250 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Penden Cement Authority Ltd. By capacity it ranks #2 of 3 cement plants tracked in Bhutan. It emits about 241,611 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 56,320 cars. Its CO₂ per unit of capacity is about 11% above the median cement plant.

602,250t of cement
241,611t CO₂e / yr (Climate TRACE)
#2CO₂ rank in Bhutan
0.40t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895335.

Bağlamda: bu tesis nasıl karşılaştırılır

602,250 t of cement'de, Penden Cement Gomtu Cement Plant Bhutan'daki cement plant'lerin medyanı yaklaşık 602,250 t of cement'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.

Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.

What 241,611 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

56,320cars driven for a year
31,509homes' annual energy use
4,026,850tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Bhutan

Dungsam Cement Menchu Cement Plant: 1,507,450 t of cement1.5MDungsam Ce…Penden Cement Gomtu Cement Plant: 602,250 t of cement602kPenden Cem…Lhaki Cement Gomtu Cement Plant: 219,000 t of cement219kLhaki Ceme…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Penden Cement Authority Ltd. All facilities by this operator →

Local climate

Penden Cement Gomtu Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 26.8°N in the northern hemisphere.

~19°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical (dry winter): hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 3 cement plants in Bhutan by reported capacity.

Nearby industrial sites

Location

Coordinates 26.81664, 89.18801. View on OpenStreetMap.

Heat loss & insulation profile

A cement plant like this runs hot equipment that sheds heat continuously: rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves (surface/process temperatures around 200–1,000 °C). These surfaces lose energy to the air year-round; removable modular insulation cuts that loss, brings outer surfaces to ≤45 °C, and unclips for inspection.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

On an already-insulated site (pipes & valves in cladding / jackets), closing the remaining gaps, flanges and damaged sections and switching to removable covers indicatively recovers about 8,600 MWh/yr (≈ 2,900 t CO₂/yr) — scaled to this site's reported CO₂ within its sector. Bare or damaged surfaces recover several times more.

See Inzonex insulation → Estimate your site →

Indicative, not a measurement. Conservative floor for an already-insulated plant; a TIPCHECK on-site audit gives a measured figure. Industry context: EiiF TIPCHECK — industrial insulation can save ~14 Mtoe/yr in EU, payback typically <2 years.

Safety & the no-regret first step

Bare hot surfaces here exceed the touch-safe limit (EN ISO 13732-1); insulation to ≤45 °C is a worker-safety and compliance win. And before electrification, fuel-switching or CCS, eliminating surface heat loss is the cheapest, fastest, lowest-risk step — audit the bare spots first, rip-and-replace later.

External climate finance your country can access

Domestic energy-efficiency grants are limited here; industrial decarbonisation is mainly funded externally:

Routed via national development banks / accredited entities — not a direct factory grant. Verified 2026.

Frequently asked questions

What type of facility is Penden Cement Gomtu Cement Plant?

Penden Cement Gomtu Cement Plant is a cement plant in Bhutan. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Penden Cement Gomtu Cement Plant?

Penden Cement Gomtu Cement Plant has a reported capacity of 602,250 t of cement.

How much CO₂ does Penden Cement Gomtu Cement Plant emit?

Penden Cement Gomtu Cement Plant emits about 241,611 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 56,320 cars. That ranks #2 among tracked facilities in Bhutan.

Where is Penden Cement Gomtu Cement Plant located?

Penden Cement Gomtu Cement Plant is in Bhutan, near coordinates 26.81664, 89.18801.

Who operates Penden Cement Gomtu Cement Plant?

Penden Cement Gomtu Cement Plant is operated by Penden Cement Authority Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.