Cement Plant in Algeria. Approximate location 36.3335, 5.48086.
Cement PlantAlgeriaCO₂ reported
Ouled Adouane Cement Plant is a cement plant in Algeria with a reported capacity of 3,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Societe des Ciments d'Ain El Kebira. By capacity it ranks #4 of 16 cement plants tracked in Algeria. It emits about 1,578,612 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 367,975 cars. Its CO₂ per unit of capacity is about 46% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438354.
3,000,000 t of cement'de, Ouled Adouane Cement Plant Algeria'daki cement plant'lerin medyanı çok üstünde 1,200,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı üstünde kabaca 45%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Societe des Ciments d'Ain El Kebira. All facilities by this operator →
Ouled Adouane Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 36.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #4 largest of 16 cement plants in Algeria by reported capacity.
Coordinates 36.3335, 5.48086. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Ouled Adouane Cement Plant is a cement plant in Algeria. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Ouled Adouane Cement Plant has a reported capacity of 3,000,000 t of cement.
Ouled Adouane Cement Plant emits about 1,578,612 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 367,975 cars. That ranks #3 among tracked facilities in Algeria.
Ouled Adouane Cement Plant is in Algeria, near coordinates 36.3335, 5.48086.
Ouled Adouane Cement Plant is operated by Societe des Ciments d'Ain El Kebira.