Home / South America / Brazil / Cement plants / nobres Cement Plant

nobres Cement Plant

Cement Plant in Brazil. Approximate location -14.6437, -56.26493.

Cement PlantBrazilCO₂ reported

nobres Cement Plant is a cement plant in Brazil with a reported capacity of 1,200,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Votorantim Cimentos SA. By capacity it ranks #32 of 57 cement plants tracked in Brazil. It emits about 337,240 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 78,611 cars. Its CO₂ per unit of capacity is about 22% below the median cement plant.

1,200,000t of cement
337,240t CO₂e / yr (Climate TRACE)
#88CO₂ rank in Brazil
0.28t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437322.

Bağlamda: bu tesis nasıl karşılaştırılır

1,200,000 t of cement'de, nobres Cement Plant Brazil'daki cement plant'lerin medyanı yaklaşık 1,461,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı altında kabaca 14%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.

Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.

What 337,240 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

78,611cars driven for a year
43,980homes' annual energy use
5,620,667tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Brazil

Rio Branco do Sul Cement Plant: 7,000,000 t of cement7.0MRio Branco…Lagoa Santa Cement Plant: 4,900,000 t of cement4.9MLagoa Sant…Salto de Pirapora Cement Plant: 4,800,000 t of cement4.8MSalto de P…Ciplam Sobradinho Cement Plant: 3,800,000 t of cement3.8MCiplam Sob…Carandaí Cement Plant: 3,400,000 t of cement3.4MCarandaí C…Barroso Cement Plant: 3,200,000 t of cement3.2MBarroso Ce…Apiai Cement Plant: 3,200,000 t of cement3.2MApiai Ceme…Balsa nova Cement Plant: 2,800,000 t of cement2.8MBalsa nova…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Votorantim Cimentos SA. All facilities by this operator →

Local climate

nobres Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 14.6°S in the southern hemisphere.

~26°Ctypical annual mean
~29°Ctypical warm-season
Tropical savanna: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #32 largest of 57 cement plants in Brazil by reported capacity.

Nearby industrial sites

Location

Coordinates -14.6437, -56.26493. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is nobres Cement Plant?

nobres Cement Plant is a cement plant in Brazil. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of nobres Cement Plant?

nobres Cement Plant has a reported capacity of 1,200,000 t of cement.

How much CO₂ does nobres Cement Plant emit?

nobres Cement Plant emits about 337,240 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 78,611 cars. That ranks #88 among tracked facilities in Brazil.

Where is nobres Cement Plant located?

nobres Cement Plant is in Brazil, near coordinates -14.6437, -56.26493.

Who operates nobres Cement Plant?

nobres Cement Plant is operated by Votorantim Cimentos SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.