Cement Plant in Bosnia and Herzegovina. Approximate location 44.52607, 18.52689.
Cement PlantBosnia and HerzegovinaCO₂ reported
Lukavac Cement Plant is a cement plant in Bosnia and Herzegovina with a reported capacity of 700,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Lukavac Cement doo. By capacity it ranks #2 of 2 cement plants tracked in Bosnia and Herzegovina. It emits about 233,844 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 54,509 cars. Its CO₂ per unit of capacity is about 7% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437262.
700,000 t of cement'de, Lukavac Cement Plant Bosnia and Herzegovina'daki cement plant'lerin medyanı yaklaşık 770,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı altında kabaca 40%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Lukavac Cement doo. All facilities by this operator →
Lukavac Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 44.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 2 cement plants in Bosnia and Herzegovina by reported capacity.
Coordinates 44.52607, 18.52689. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Lukavac Cement Plant is a cement plant in Bosnia and Herzegovina. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Lukavac Cement Plant has a reported capacity of 700,000 t of cement.
Lukavac Cement Plant emits about 233,844 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 54,509 cars. That ranks #4 among tracked facilities in Bosnia and Herzegovina.
Lukavac Cement Plant is in Bosnia and Herzegovina, near coordinates 44.52607, 18.52689.
Lukavac Cement Plant is operated by Lukavac Cement doo.