Home / Europe / Bosnia and Herzegovina / Cement plants / Lukavac Cement Plant

Lukavac Cement Plant

Cement Plant in Bosnia and Herzegovina. Approximate location 44.52607, 18.52689.

Cement PlantBosnia and HerzegovinaCO₂ reported

Lukavac Cement Plant is a cement plant in Bosnia and Herzegovina with a reported capacity of 700,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Lukavac Cement doo. By capacity it ranks #2 of 2 cement plants tracked in Bosnia and Herzegovina. It emits about 233,844 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 54,509 cars. Its CO₂ per unit of capacity is about 7% below the median cement plant.

700,000t of cement
233,844t CO₂e / yr (Climate TRACE)
#4CO₂ rank in Bosnia and Herzegovina
0.33t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437262.

Bağlamda: bu tesis nasıl karşılaştırılır

700,000 t of cement'de, Lukavac Cement Plant Bosnia and Herzegovina'daki cement plant'lerin medyanı yaklaşık 770,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı altında kabaca 40%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.

Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.

What 233,844 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

54,509cars driven for a year
30,496homes' annual energy use
3,897,400tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Bosnia and Herzegovina

Kakanj Cement Plant: 770,000 t of cement770kKakanj Cem…Lukavac Cement Plant: 700,000 t of cement700kLukavac Ce…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Lukavac Cement doo. All facilities by this operator →

Local climate

Lukavac Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 44.5°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 2 cement plants in Bosnia and Herzegovina by reported capacity.

Nearby industrial sites

Location

Coordinates 44.52607, 18.52689. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Lukavac Cement Plant?

Lukavac Cement Plant is a cement plant in Bosnia and Herzegovina. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Lukavac Cement Plant?

Lukavac Cement Plant has a reported capacity of 700,000 t of cement.

How much CO₂ does Lukavac Cement Plant emit?

Lukavac Cement Plant emits about 233,844 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 54,509 cars. That ranks #4 among tracked facilities in Bosnia and Herzegovina.

Where is Lukavac Cement Plant located?

Lukavac Cement Plant is in Bosnia and Herzegovina, near coordinates 44.52607, 18.52689.

Who operates Lukavac Cement Plant?

Lukavac Cement Plant is operated by Lukavac Cement doo.

Built from open public data; no personal information. Operate this site? Request a correction or removal.