Home / Africa / Egypt / Cement plants / Juhayna West Cement Plant

Juhayna West Cement Plant

Cement Plant in Egypt. Approximate location 26.65769, 31.32119.

Cement PlantEgyptCO₂ reported

Juhayna West Cement Plant is a cement plant in Egypt with a reported capacity of 2,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Lafarge Cement Company Egypt SAE. By capacity it ranks #18 of 26 cement plants tracked in Egypt. It emits about 724,251 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 168,823 cars.

2,000,000t of cement
724,251t CO₂e / yr (Climate TRACE)
#27CO₂ rank in Egypt
0.36t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547266.

Bağlamda: bu tesis nasıl karşılaştırılır

2,000,000 t of cement'de, Juhayna West Cement Plant Egypt'daki cement plant'lerin medyanı altında 2,690,000 t of cement'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.

Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.

What 724,251 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

168,823cars driven for a year
94,451homes' annual energy use
12,070,850tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Egypt

National Cement New Beni Suef Cement Plant: 12,000,000 t of cement12.0MNational C…Lafarge Attaka Cement Plant: 10,200,000 t of cement10.2MLafarge At…Helwan Cement Plant: 8,000,000 t of cement8.0MHelwan Cem…National Cement El Hassana Cement Plant: 7,000,000 t of cement7.0MNational C…Assiuit Cement Asyut Plant: 5,700,000 t of cement5.7MAssiuit Ce…Arabian Cement Attaka Plant: 5,000,000 t of cement5.0MArabian Ce…Borg El Arab Cement Plant: 4,800,000 t of cement4.8MBorg El Ar…Tura Cement Plant: 4,000,000 t of cement4.0MTura Cemen…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Lafarge Cement Company Egypt SAE. All facilities by this operator →

Local climate

Juhayna West Cement Plant sits in a hot desert climate zone (Köppen BWh), at 26.7°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #18 largest of 26 cement plants in Egypt by reported capacity.

Nearby industrial sites

Location

Coordinates 26.65769, 31.32119. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Juhayna West Cement Plant?

Juhayna West Cement Plant is a cement plant in Egypt. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Juhayna West Cement Plant?

Juhayna West Cement Plant has a reported capacity of 2,000,000 t of cement.

How much CO₂ does Juhayna West Cement Plant emit?

Juhayna West Cement Plant emits about 724,251 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 168,823 cars. That ranks #27 among tracked facilities in Egypt.

Where is Juhayna West Cement Plant located?

Juhayna West Cement Plant is in Egypt, near coordinates 26.65769, 31.32119.

Who operates Juhayna West Cement Plant?

Juhayna West Cement Plant is operated by Lafarge Cement Company Egypt SAE.

Built from open public data; no personal information. Operate this site? Request a correction or removal.