Cement Plant in Turkmenistan. Approximate location 39.68401, 54.30231.
Cement PlantTurkmenistanCO₂ reported
Jebel Cement Plant is a cement plant in Turkmenistan with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Ministry of Industry and Construction Production (Turkmenistan). By capacity it ranks #3 of 4 cement plants tracked in Turkmenistan. It emits about 530,823 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 123,735 cars. Its CO₂ per unit of capacity is about 47% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897836.
1,000,000 t of cement'de, Jebel Cement Plant Turkmenistan'daki cement plant'lerin medyanı altında 2,000,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı altında kabaca 12%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Ministry of Industry and Construction Production (Turkmenistan). All facilities by this operator →
Jebel Cement Plant sits in a cold desert climate zone (Köppen BWk), at 39.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 4 cement plants in Turkmenistan by reported capacity.
Coordinates 39.68401, 54.30231. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Jebel Cement Plant is a cement plant in Turkmenistan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Jebel Cement Plant has a reported capacity of 1,000,000 t of cement.
Jebel Cement Plant emits about 530,823 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 123,735 cars. That ranks #5 among tracked facilities in Turkmenistan.
Jebel Cement Plant is in Turkmenistan, near coordinates 39.68401, 54.30231.
Jebel Cement Plant is operated by Ministry of Industry and Construction Production (Turkmenistan).