Home / Africa / Morocco / Cement plants / Imi Mqourn Cement Plant

Imi Mqourn Cement Plant

Cement Plant in Morocco. Approximate location 30.22041, -9.15396.

Cement PlantMoroccoCO₂ reported

Imi Mqourn Cement Plant is a cement plant in Morocco with a reported capacity of 2,200,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Ciments du Maroc SA. By capacity it ranks #3 of 14 cement plants tracked in Morocco. It emits about 454,191 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 105,872 cars. Its CO₂ per unit of capacity is about 43% below the median cement plant.

2,200,000t of cement
454,191t CO₂e / yr (Climate TRACE)
#9CO₂ rank in Morocco
0.21t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897456.

Bağlamda: bu tesis nasıl karşılaştırılır

2,200,000 t of cement'de, Imi Mqourn Cement Plant Morocco'daki cement plant'lerin medyanı çok üstünde 1,600,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı altında kabaca 35%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.

Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.

What 454,191 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

105,872cars driven for a year
59,232homes' annual energy use
7,569,850tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Morocco

Lafarge Settat Cement Plant 2: 3,000,000 t of cement3.0MLafarge Se…Tetouan Cement Plant: 2,500,000 t of cement2.5MTetouan Ce…Imi Mqourn Cement Plant: 2,200,000 t of cement2.2MImi Mqourn…Meknes Cement Plant: 1,750,000 t of cement1.8MMeknes Cem…Lafarge Settat Cement Plant 1: 1,700,000 t of cement1.7MLafarge Se…Ouled Ghanem Cement Plant: 1,600,000 t of cement1.6MOuled Ghan…Lafarge Taroudant Cement Plant: 1,600,000 t of cement1.6MLafarge Ta…Dir El Ksiba Cement Plant: 1,600,000 t of cement1.6MDir El Ksi…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Ciments du Maroc SA. All facilities by this operator →

Local climate

Imi Mqourn Cement Plant sits in a hot semi-arid steppe climate zone (Köppen BSh), at 30.2°N in the northern hemisphere.

~23°Ctypical annual mean
~31°Ctypical warm-season
Hot semi-arid steppe: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #3 largest of 14 cement plants in Morocco by reported capacity.

Nearby industrial sites

Location

Coordinates 30.22041, -9.15396. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Imi Mqourn Cement Plant?

Imi Mqourn Cement Plant is a cement plant in Morocco. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Imi Mqourn Cement Plant?

Imi Mqourn Cement Plant has a reported capacity of 2,200,000 t of cement.

How much CO₂ does Imi Mqourn Cement Plant emit?

Imi Mqourn Cement Plant emits about 454,191 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 105,872 cars. That ranks #9 among tracked facilities in Morocco.

Where is Imi Mqourn Cement Plant located?

Imi Mqourn Cement Plant is in Morocco, near coordinates 30.22041, -9.15396.

Who operates Imi Mqourn Cement Plant?

Imi Mqourn Cement Plant is operated by Ciments du Maroc SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.