Cement Plant in China. Approximate location 38.1718, 114.21829.
Cement PlantChinaCO₂ reported
Hebei Jinyu Dingxin Cement Co Ltd Cement Plant 1 is a cement plant in China with a reported capacity of 1,230,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Hebei Jinyu Dingxin Cement Co Ltd. By capacity it ranks #542 of 739 cement plants tracked in China. It emits about 537,768 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 125,354 cars. Its CO₂ per unit of capacity is about 21% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896104.
1,230,000 t of cement'de, Hebei Jinyu Dingxin Cement Co Ltd Cement Plant 1 China'daki cement plant'lerin medyanı altında 2,000,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı üstünde kabaca 21%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Hebei Jinyu Dingxin Cement Co Ltd. All facilities by this operator →
Hebei Jinyu Dingxin Cement Co Ltd Cement Plant 1 sits in a monsoon hot-summer continental climate zone (Köppen Dwa), at 38.2°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #542 largest of 739 cement plants in China by reported capacity.
Coordinates 38.1718, 114.21829. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Hebei Jinyu Dingxin Cement Co Ltd Cement Plant 1 is a cement plant in China. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Hebei Jinyu Dingxin Cement Co Ltd Cement Plant 1 has a reported capacity of 1,230,000 t of cement.
Hebei Jinyu Dingxin Cement Co Ltd Cement Plant 1 emits about 537,768 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 125,354 cars. That ranks #1044 among tracked facilities in China.
Hebei Jinyu Dingxin Cement Co Ltd Cement Plant 1 is in China, near coordinates 38.1718, 114.21829.
Hebei Jinyu Dingxin Cement Co Ltd Cement Plant 1 is operated by Hebei Jinyu Dingxin Cement Co Ltd.