Cement Plant in China. Approximate location 35.60477, 110.5427.
Cement PlantChinaCO₂ reported
Hancheng Hanyu Building Materials & Mining Co. Cement Plant is a cement plant in China with a reported capacity of 960,526 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Hancheng Hanyu Building Materials & Mining Co. By capacity it ranks #669 of 739 cement plants tracked in China. It emits about 350,149 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 81,620 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547254.
960,526 t of cement'de, Hancheng Hanyu Building Materials & Mining Co. Cement Plant China'daki cement plant'lerin medyanı altında 2,000,000 t of cement'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Hancheng Hanyu Building Materials & Mining Co. All facilities by this operator →
Hancheng Hanyu Building Materials & Mining Co. Cement Plant sits in a monsoon hot-summer continental climate zone (Köppen Dwa), at 35.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #669 largest of 739 cement plants in China by reported capacity.
Coordinates 35.60477, 110.5427. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Hancheng Hanyu Building Materials & Mining Co. Cement Plant is a cement plant in China. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Hancheng Hanyu Building Materials & Mining Co. Cement Plant has a reported capacity of 960,526 t of cement.
Hancheng Hanyu Building Materials & Mining Co. Cement Plant emits about 350,149 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 81,620 cars. That ranks #1308 among tracked facilities in China.
Hancheng Hanyu Building Materials & Mining Co. Cement Plant is in China, near coordinates 35.60477, 110.5427.
Hancheng Hanyu Building Materials & Mining Co. Cement Plant is operated by Hancheng Hanyu Building Materials & Mining Co.