Cement Plant in Pakistan. Approximate location 33.80184, 72.09547.
Cement PlantPakistanCO₂ reported
Fauji Cement Nizampur Cement Plant is a cement plant in Pakistan with a reported capacity of 3,750,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Fauji Cement Co Ltd. By capacity it ranks #8 of 31 cement plants tracked in Pakistan. It emits about 2,063,502 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 481,003 cars. Its CO₂ per unit of capacity is about 53% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897606.
3,750,000 t of cement'de, Fauji Cement Nizampur Cement Plant Pakistan'daki cement plant'lerin medyanı çok üstünde 2,300,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı üstünde kabaca 20%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Fauji Cement Co Ltd. All facilities by this operator →
Fauji Cement Nizampur Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 33.8°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #8 largest of 31 cement plants in Pakistan by reported capacity.
Coordinates 33.80184, 72.09547. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Fauji Cement Nizampur Cement Plant is a cement plant in Pakistan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Fauji Cement Nizampur Cement Plant has a reported capacity of 3,750,000 t of cement.
Fauji Cement Nizampur Cement Plant emits about 2,063,502 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 481,003 cars. That ranks #6 among tracked facilities in Pakistan.
Fauji Cement Nizampur Cement Plant is in Pakistan, near coordinates 33.80184, 72.09547.
Fauji Cement Nizampur Cement Plant is operated by Fauji Cement Co Ltd.