Cement Plant in United Arab Emirates. Approximate location 24.00208, 55.43787.
Cement PlantUnited Arab EmiratesCO₂ reported
EMSteel Industrial City Cement Plant is a cement plant in United Arab Emirates with a reported capacity of 5,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Emsteel Building Materials PJSC. By capacity it ranks #1 of 12 cement plants tracked in United Arab Emirates. It emits about 2,288,162 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 533,371 cars. Its CO₂ per unit of capacity is about 27% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437202.
5,000,000 t of cement'de, EMSteel Industrial City Cement Plant United Arab Emirates'daki cement plant'lerin medyanı çok üstünde 2,700,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı üstünde kabaca 13%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Emsteel Building Materials PJSC. All facilities by this operator →
EMSteel Industrial City Cement Plant sits in a hot desert climate zone (Köppen BWh), at 24.0°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 12 cement plants in United Arab Emirates by reported capacity.
Coordinates 24.00208, 55.43787. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

EMSteel Industrial City Cement Plant is a cement plant in United Arab Emirates. It burns limestone in high-temperature rotary kilns to make clinker and cement.
EMSteel Industrial City Cement Plant has a reported capacity of 5,000,000 t of cement.
EMSteel Industrial City Cement Plant emits about 2,288,162 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 533,371 cars. That ranks #7 among tracked facilities in United Arab Emirates.
EMSteel Industrial City Cement Plant is in United Arab Emirates, near coordinates 24.00208, 55.43787.
EMSteel Industrial City Cement Plant is operated by Emsteel Building Materials PJSC.