Cement Plant in Germany. Approximate location 51.62242, 8.5031.
Cement PlantGermanyCO₂ reported
Dykerhoff Geseke Cement Plant is a cement plant in Germany with a reported capacity of 380,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Dyckerhoff GmbH. By capacity it ranks #31 of 32 cement plants tracked in Germany. It emits about 155,469 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 36,240 cars. Its CO₂ per unit of capacity is about 14% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438309.
380,000 t of cement'de, Dykerhoff Geseke Cement Plant Germany'daki cement plant'lerin medyanı altında 1,000,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı üstünde kabaca 29%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Dyckerhoff GmbH. All facilities by this operator →
Dykerhoff Geseke Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 51.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #31 largest of 32 cement plants in Germany by reported capacity.
Coordinates 51.62242, 8.5031. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Dykerhoff Geseke Cement Plant is a cement plant in Germany. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Dykerhoff Geseke Cement Plant has a reported capacity of 380,000 t of cement.
Dykerhoff Geseke Cement Plant emits about 155,469 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 36,240 cars. That ranks #84 among tracked facilities in Germany.
Dykerhoff Geseke Cement Plant is in Germany, near coordinates 51.62242, 8.5031.
Dykerhoff Geseke Cement Plant is operated by Dyckerhoff GmbH.