Steel Plant in Poland. Approximate location 52.29727, 20.92562.
Steel PlantPolandCO₂ reported
ArcelorMittal Warszawa steel plant is a steel plant in Poland with a reported capacity of 750,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Arcelormittal Warszawa SP zoo. By capacity it ranks #5 of 6 steel plants tracked in Poland. It emits about 63,619 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 14,830 cars. Its CO₂ per unit of capacity is about 84% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567006.
750,000 t of steel'de, ArcelorMittal Warszawa steel plant Poland'daki steel plant'lerin medyanı yaklaşık 900,000 t of steel'dir. Alt sektör: iron-and-steel. steel plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1500°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çelik fabrikaları yüksek ocaklarda kömür yakar veya hurda ergitmek için elektrik ark kullanır; her iki durumda da eritilmiş metal 1.500°C'nin üstünde tutulmalı ve geniş sıcak borular ve kaplar aracılığıyla aktarılmalıdır.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Arcelormittal Warszawa SP zoo. All facilities by this operator →
ArcelorMittal Warszawa steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 52.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #5 largest of 6 steel plants in Poland by reported capacity.
Coordinates 52.29727, 20.92562. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

ArcelorMittal Warszawa steel plant is a steel plant in Poland. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
ArcelorMittal Warszawa steel plant has a reported capacity of 750,000 t of steel.
ArcelorMittal Warszawa steel plant emits about 63,619 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 14,830 cars. That ranks #27 among tracked facilities in Poland.
ArcelorMittal Warszawa steel plant is in Poland, near coordinates 52.29727, 20.92562.
ArcelorMittal Warszawa steel plant is operated by Arcelormittal Warszawa SP zoo.