Cement Plant in Yemen. Approximate location 15.64999, 43.92167.
Cement PlantYemenCO₂ reported
Amran Cement Plant is a cement plant in Yemen with a reported capacity of 1,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Yemen General Corporation for Cement Industry and Marketing. By capacity it ranks #3 of 6 cement plants tracked in Yemen. It emits about 788,259 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 183,743 cars. Its CO₂ per unit of capacity is about 46% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439409.
1,500,000 t of cement'de, Amran Cement Plant Yemen'daki cement plant'lerin medyanı yaklaşık 1,500,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı üstünde kabaca 29%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Yemen General Corporation for Cement Industry and Marketing. All facilities by this operator →
Amran Cement Plant sits in a cold desert climate zone (Köppen BWk), at 15.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 6 cement plants in Yemen by reported capacity.
Coordinates 15.64999, 43.92167. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Amran Cement Plant is a cement plant in Yemen. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Amran Cement Plant has a reported capacity of 1,500,000 t of cement.
Amran Cement Plant emits about 788,259 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 183,743 cars. That ranks #2 among tracked facilities in Yemen.
Amran Cement Plant is in Yemen, near coordinates 15.64999, 43.92167.
Amran Cement Plant is operated by Yemen General Corporation for Cement Industry and Marketing.