Cement Plant in Germany. Approximate location 48.33317, 9.73331.
Cement PlantGermanyCO₂ reported
Allmendingen Cement Plant is a cement plant in Germany with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by SCHWENK Zement GmbH & Co KG. By capacity it ranks #13 of 32 cement plants tracked in Germany. It emits about 340,704 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 79,418 cars. Its CO₂ per unit of capacity is about 5% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438333.
1,000,000 t of cement'de, Allmendingen Cement Plant Germany'daki cement plant'lerin medyanı yaklaşık 1,000,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı üstünde kabaca 7%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by SCHWENK Zement GmbH & Co KG. All facilities by this operator →
Allmendingen Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 48.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #13 largest of 32 cement plants in Germany by reported capacity.
Coordinates 48.33317, 9.73331. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Allmendingen Cement Plant is a cement plant in Germany. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Allmendingen Cement Plant has a reported capacity of 1,000,000 t of cement.
Allmendingen Cement Plant emits about 340,704 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 79,418 cars. That ranks #51 among tracked facilities in Germany.
Allmendingen Cement Plant is in Germany, near coordinates 48.33317, 9.73331.
Allmendingen Cement Plant is operated by SCHWENK Zement GmbH & Co KG.