Cement Plant in Türkiye. Approximate location 41.64045, 32.30419.
Cement PlantTürkiyeCO₂ reported
Sanko Bartin Cement Plant is a cement plant in Türkiye with a reported capacity of 2,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Cimko Cimento ve Beton Sanayi ve Ticaret AŞ. By capacity it ranks #17 of 57 cement plants tracked in Türkiye. It emits about 1,548,905 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 361,050 cars. Its CO₂ per unit of capacity is about 72% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439212.
На мощности 2,500,000 t of cement Sanko Bartin Cement Plant — это значительно выше медианная cement plant в Türkiye (2,000,000 t of cement). Его выброс CO₂ на единицу мощности примерно на 71% выше медианной cement plant. Подсектор: cement. Как cement plant, оно требует высокотемпературного технологического тепла (обычно 800–1400°C) для основных промышленных операций — тепла, которое должно подаваться котлами, печами или прямым сжиганием, и потери через неизолированные сосуды и трубопроводы представляют потраченное впустую топливо. Съёмная модульная теплоизоляция может снизить эти потери на 80–96%, охладив поверхность оборудования до ≤45°C, с окупаемостью часто менее 2 лет. Цементные заводы нагревают известняк до 1400°C во вращающихся печах — один из самых горячих промышленных процессов — и должны точно контролировать температуру по всей длине печи.
Сравнение производительности и интенсивности CO₂ рассчитано на основе данных промышленных объектов Climate TRACE; роль сектора основана на инженерных справочниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Cimko Cimento ve Beton Sanayi ve Ticaret AŞ. All facilities by this operator →
Sanko Bartin Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 41.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #17 largest of 57 cement plants in Türkiye by reported capacity.
Coordinates 41.64045, 32.30419. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Sanko Bartin Cement Plant is a cement plant in Türkiye. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Sanko Bartin Cement Plant has a reported capacity of 2,500,000 t of cement.
Sanko Bartin Cement Plant emits about 1,548,905 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 361,050 cars. That ranks #15 among tracked facilities in Türkiye.
Sanko Bartin Cement Plant is in Türkiye, near coordinates 41.64045, 32.30419.
Sanko Bartin Cement Plant is operated by Cimko Cimento ve Beton Sanayi ve Ticaret AŞ.