Cement Plant in Bhutan. Approximate location 26.81664, 89.18801.
Cement PlantBhutanCO₂ reported
Penden Cement Gomtu Cement Plant is a cement plant in Bhutan with a reported capacity of 602,250 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Penden Cement Authority Ltd. By capacity it ranks #2 of 3 cement plants tracked in Bhutan. It emits about 241,611 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 56,320 cars. Its CO₂ per unit of capacity is about 11% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895335.
На мощности 602,250 t of cement Penden Cement Gomtu Cement Plant — это примерно медианная cement plant в Bhutan (602,250 t of cement). Подсектор: cement. Как cement plant, оно требует высокотемпературного технологического тепла (обычно 800–1400°C) для основных промышленных операций — тепла, которое должно подаваться котлами, печами или прямым сжиганием, и потери через неизолированные сосуды и трубопроводы представляют потраченное впустую топливо. Съёмная модульная теплоизоляция может снизить эти потери на 80–96%, охладив поверхность оборудования до ≤45°C, с окупаемостью часто менее 2 лет. Цементные заводы нагревают известняк до 1400°C во вращающихся печах — один из самых горячих промышленных процессов — и должны точно контролировать температуру по всей длине печи.
Сравнение производительности и интенсивности CO₂ рассчитано на основе данных промышленных объектов Climate TRACE; роль сектора основана на инженерных справочниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Penden Cement Authority Ltd. All facilities by this operator →
Penden Cement Gomtu Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 26.8°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 3 cement plants in Bhutan by reported capacity.
Coordinates 26.81664, 89.18801. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Penden Cement Gomtu Cement Plant is a cement plant in Bhutan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Penden Cement Gomtu Cement Plant has a reported capacity of 602,250 t of cement.
Penden Cement Gomtu Cement Plant emits about 241,611 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 56,320 cars. That ranks #2 among tracked facilities in Bhutan.
Penden Cement Gomtu Cement Plant is in Bhutan, near coordinates 26.81664, 89.18801.
Penden Cement Gomtu Cement Plant is operated by Penden Cement Authority Ltd.