Home / Oceania / Australia / Cement plants / New Berrima Cement Plant

New Berrima Cement Plant

Cement Plant in Australia. Approximate location -34.51014, 150.33322.

Cement PlantAustraliaCO₂ reported

New Berrima Cement Plant is a cement plant in Australia with a reported capacity of 1,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Boral Cement Ltd. By capacity it ranks #3 of 5 cement plants tracked in Australia. It emits about 292,619 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 68,210 cars. Its CO₂ per unit of capacity is about 46% below the median cement plant.

1,500,000t of cement
292,619t CO₂e / yr (Climate TRACE)
#26CO₂ rank in Australia
0.20t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895142.

В контексте: как это предприятие сравнивается

На мощности 1,500,000 t of cement New Berrima Cement Plant — это примерно медианная cement plant в Australia (1,500,000 t of cement). Его выброс CO₂ на единицу мощности примерно на 44% ниже медианной cement plant. Подсектор: cement. Как cement plant, оно требует высокотемпературного технологического тепла (обычно 800–1400°C) для основных промышленных операций — тепла, которое должно подаваться котлами, печами или прямым сжиганием, и потери через неизолированные сосуды и трубопроводы представляют потраченное впустую топливо. Съёмная модульная теплоизоляция может снизить эти потери на 80–96%, охладив поверхность оборудования до ≤45°C, с окупаемостью часто менее 2 лет. Цементные заводы нагревают известняк до 1400°C во вращающихся печах — один из самых горячих промышленных процессов — и должны точно контролировать температуру по всей длине печи.

Сравнение производительности и интенсивности CO₂ рассчитано на основе данных промышленных объектов Climate TRACE; роль сектора основана на инженерных справочниках.

What 292,619 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

68,210cars driven for a year
38,161homes' annual energy use
4,876,983tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Australia

Birkenhead Cement Plant: 1,600,000 t of cement1.6MBirkenhead…Gladstone Cement Plant: 1,600,000 t of cement1.6MGladstone …New Berrima Cement Plant: 1,500,000 t of cement1.5MNew Berrim…Railton Cement Plant: 1,400,000 t of cement1.4MRailton Ce…Angaston Cement Plant: 280,000 t of cement280kAngaston C…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Boral Cement Ltd. All facilities by this operator →

Local climate

New Berrima Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 34.5°S in the southern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #3 largest of 5 cement plants in Australia by reported capacity.

Nearby industrial sites

Location

Coordinates -34.51014, 150.33322. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is New Berrima Cement Plant?

New Berrima Cement Plant is a cement plant in Australia. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of New Berrima Cement Plant?

New Berrima Cement Plant has a reported capacity of 1,500,000 t of cement.

How much CO₂ does New Berrima Cement Plant emit?

New Berrima Cement Plant emits about 292,619 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 68,210 cars. That ranks #26 among tracked facilities in Australia.

Where is New Berrima Cement Plant located?

New Berrima Cement Plant is in Australia, near coordinates -34.51014, 150.33322.

Who operates New Berrima Cement Plant?

New Berrima Cement Plant is operated by Boral Cement Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.