Home / Asia / Azerbaijan / Cement plants / Holcim Garadagh Cement Plant

Holcim Garadagh Cement Plant

Cement Plant in Azerbaijan. Approximate location 40.22469, 49.55794.

Cement PlantAzerbaijanCO₂ reported

Holcim Garadagh Cement Plant is a cement plant in Azerbaijan with a reported capacity of 1,700,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim (Azerbaijan) OJSC. By capacity it ranks #2 of 3 cement plants tracked in Azerbaijan. It emits about 388,063 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 90,458 cars. Its CO₂ per unit of capacity is about 37% below the median cement plant.

1,700,000t of cement
388,063t CO₂e / yr (Climate TRACE)
#4CO₂ rank in Azerbaijan
0.23t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895164.

В контексте: как это предприятие сравнивается

На мощности 1,700,000 t of cement Holcim Garadagh Cement Plant — это примерно медианная cement plant в Azerbaijan (1,700,000 t of cement). Его выброс CO₂ на единицу мощности примерно на 31% ниже медианной cement plant. Подсектор: cement. Как cement plant, оно требует высокотемпературного технологического тепла (обычно 800–1400°C) для основных промышленных операций — тепла, которое должно подаваться котлами, печами или прямым сжиганием, и потери через неизолированные сосуды и трубопроводы представляют потраченное впустую топливо. Съёмная модульная теплоизоляция может снизить эти потери на 80–96%, охладив поверхность оборудования до ≤45°C, с окупаемостью часто менее 2 лет. Цементные заводы нагревают известняк до 1400°C во вращающихся печах — один из самых горячих промышленных процессов — и должны точно контролировать температуру по всей длине печи.

Сравнение производительности и интенсивности CO₂ рассчитано на основе данных промышленных объектов Climate TRACE; роль сектора основана на инженерных справочниках.

What 388,063 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

90,458cars driven for a year
50,608homes' annual energy use
6,467,717tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Azerbaijan

Norm Sement Qizildas Cement Plant: 2,100,000 t of cement2.1MNorm Semen…Holcim Garadagh Cement Plant: 1,700,000 t of cement1.7MHolcim Gar…Arkoz Gazakh Cement Plant: 1,300,000 t of cement1.3MArkoz Gaza…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Holcim (Azerbaijan) OJSC. All facilities by this operator →

Local climate

Holcim Garadagh Cement Plant sits in a cold semi-arid steppe climate zone (Köppen BSk), at 40.2°N in the northern hemisphere.

~10°Ctypical annual mean
~23°Ctypical warm-season
Cold semi-arid steppe: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 3 cement plants in Azerbaijan by reported capacity.

Nearby industrial sites

Location

Coordinates 40.22469, 49.55794. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Holcim Garadagh Cement Plant?

Holcim Garadagh Cement Plant is a cement plant in Azerbaijan. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Holcim Garadagh Cement Plant?

Holcim Garadagh Cement Plant has a reported capacity of 1,700,000 t of cement.

How much CO₂ does Holcim Garadagh Cement Plant emit?

Holcim Garadagh Cement Plant emits about 388,063 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 90,458 cars. That ranks #4 among tracked facilities in Azerbaijan.

Where is Holcim Garadagh Cement Plant located?

Holcim Garadagh Cement Plant is in Azerbaijan, near coordinates 40.22469, 49.55794.

Who operates Holcim Garadagh Cement Plant?

Holcim Garadagh Cement Plant is operated by Holcim (Azerbaijan) OJSC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.