Home / Asia / Indonesia / Steel plants / Gunung Raja Paksi West Java steel plant

Gunung Raja Paksi West Java steel plant

Steel Plant in Indonesia. Approximate location -6.27974, 107.11496.

Steel PlantIndonesiaCO₂ reported

Gunung Raja Paksi West Java steel plant is a steel plant in Indonesia with a reported capacity of 2,800,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by PT Gunung Raja Paksi Tbk. By capacity it ranks #4 of 8 steel plants tracked in Indonesia. It emits about 1,748,129 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 407,489 cars. Its CO₂ per unit of capacity is about 16% above the median steel plant.

2,800,000t of steel
1,748,129t CO₂e / yr (Climate TRACE)
#11CO₂ rank in Indonesia
0.62t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32441187.

В контексте: как это предприятие сравнивается

На мощности 2,800,000 t of steel Gunung Raja Paksi West Java steel plant — это примерно медианная steel plant в Indonesia (2,800,000 t of steel). Подсектор: iron-and-steel. Как steel plant, оно требует высокотемпературного технологического тепла (обычно 800–1500°C) для основных промышленных операций — тепла, которое должно подаваться котлами, печами или прямым сжиганием, и потери через неизолированные сосуды и трубопроводы представляют потраченное впустую топливо. Съёмная модульная теплоизоляция может снизить эти потери на 80–96%, охладив поверхность оборудования до ≤45°C, с окупаемостью часто менее 2 лет. Сталелитейные заводы сжигают уголь в доменных печах или используют электрические дуги для плавления лома; в обоих случаях расплавленный металл должен находиться выше 1500°C и транспортироваться через обширные горячие трубопроводы и сосуды.

Сравнение производительности и интенсивности CO₂ рассчитано на основе данных промышленных объектов Climate TRACE; роль сектора основана на инженерных справочниках.

What 1,748,129 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

407,489cars driven for a year
227,977homes' annual energy use
29,135,483tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Indonesia

Dexin Steel Morowali plant: 7,000,000 t of steel7.0MDexin Stee…Krakatau Steel Cilegon plant: 4,000,000 t of steel4.0MKrakatau S…KS Posco Cilegon steel plant: 3,000,000 t of steel3.0MKS Posco C…Gunung Raja Paksi West Java steel plant: 2,800,000 t of steel2.8MGunung Raj…Master Steel Jakarta Steel plant: 1,500,000 t of steel1.5MMaster Ste…CNR Mandan Steel South Kalimantan plant: 1,000,000 t of steel1000kCNR Mandan…Jakarta Prima Steel Industries plant: 900,000 t of steel900kJakarta Pr…PT Ispat Indo steel plant: 650,000 t of steel650kPT Ispat I…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by PT Gunung Raja Paksi Tbk. All facilities by this operator →

Local climate

Gunung Raja Paksi West Java steel plant sits in a tropical rainforest climate zone (Köppen Af), at 6.3°S in the southern hemisphere.

~26°Ctypical annual mean
~27°Ctypical warm-season
Tropical rainforest: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #4 largest of 8 steel plants in Indonesia by reported capacity.

Nearby industrial sites

Location

Coordinates -6.27974, 107.11496. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Gunung Raja Paksi West Java steel plant?

Gunung Raja Paksi West Java steel plant is a steel plant in Indonesia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Gunung Raja Paksi West Java steel plant?

Gunung Raja Paksi West Java steel plant has a reported capacity of 2,800,000 t of steel.

How much CO₂ does Gunung Raja Paksi West Java steel plant emit?

Gunung Raja Paksi West Java steel plant emits about 1,748,129 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 407,489 cars. That ranks #11 among tracked facilities in Indonesia.

Where is Gunung Raja Paksi West Java steel plant located?

Gunung Raja Paksi West Java steel plant is in Indonesia, near coordinates -6.27974, 107.11496.

Who operates Gunung Raja Paksi West Java steel plant?

Gunung Raja Paksi West Java steel plant is operated by PT Gunung Raja Paksi Tbk.

Built from open public data; no personal information. Operate this site? Request a correction or removal.