Steel Plant in Poland. Approximate location 50.35432, 18.61081.
Steel PlantPolandCO₂ reported
Ferrostal Labedy Gliwice steel plant is a steel plant in Poland with a reported capacity of 500,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Ferrostal Labedy SP zoo. By capacity it ranks #6 of 6 steel plants tracked in Poland. It emits about 26,929 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 6,277 cars. Its CO₂ per unit of capacity is about 90% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567007.
На мощности 500,000 t of steel Ferrostal Labedy Gliwice steel plant — это ниже медианная steel plant в Poland (900,000 t of steel). Его выброс CO₂ на единицу мощности примерно на 37% ниже медианной steel plant. Подсектор: iron-and-steel. Как steel plant, оно требует высокотемпературного технологического тепла (обычно 800–1500°C) для основных промышленных операций — тепла, которое должно подаваться котлами, печами или прямым сжиганием, и потери через неизолированные сосуды и трубопроводы представляют потраченное впустую топливо. Съёмная модульная теплоизоляция может снизить эти потери на 80–96%, охладив поверхность оборудования до ≤45°C, с окупаемостью часто менее 2 лет. Сталелитейные заводы сжигают уголь в доменных печах или используют электрические дуги для плавления лома; в обоих случаях расплавленный металл должен находиться выше 1500°C и транспортироваться через обширные горячие трубопроводы и сосуды.
Сравнение производительности и интенсивности CO₂ рассчитано на основе данных промышленных объектов Climate TRACE; роль сектора основана на инженерных справочниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Ferrostal Labedy SP zoo. All facilities by this operator →
Ferrostal Labedy Gliwice steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 50.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #6 largest of 6 steel plants in Poland by reported capacity.
Coordinates 50.35432, 18.61081. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Ferrostal Labedy Gliwice steel plant is a steel plant in Poland. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Ferrostal Labedy Gliwice steel plant has a reported capacity of 500,000 t of steel.
Ferrostal Labedy Gliwice steel plant emits about 26,929 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 6,277 cars. That ranks #149 among tracked facilities in Poland.
Ferrostal Labedy Gliwice steel plant is in Poland, near coordinates 50.35432, 18.61081.
Ferrostal Labedy Gliwice steel plant is operated by Ferrostal Labedy SP zoo.