Cement Plant in United Arab Emirates. Approximate location 25.29706, 55.61827.
Cement PlantUnited Arab EmiratesCO₂ reported
Al Saajah Cement Plant is a cement plant in United Arab Emirates with a reported capacity of 4,270,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Sharjah Cement Factory. By capacity it ranks #3 of 12 cement plants tracked in United Arab Emirates. It emits about 1,360,845 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 317,213 cars. Its CO₂ per unit of capacity is about 12% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895105.
На мощности 4,270,000 t of cement Al Saajah Cement Plant — это значительно выше медианная cement plant в United Arab Emirates (2,700,000 t of cement). Его выброс CO₂ на единицу мощности примерно на 21% ниже медианной cement plant. Подсектор: cement. Как cement plant, оно требует высокотемпературного технологического тепла (обычно 800–1400°C) для основных промышленных операций — тепла, которое должно подаваться котлами, печами или прямым сжиганием, и потери через неизолированные сосуды и трубопроводы представляют потраченное впустую топливо. Съёмная модульная теплоизоляция может снизить эти потери на 80–96%, охладив поверхность оборудования до ≤45°C, с окупаемостью часто менее 2 лет. Цементные заводы нагревают известняк до 1400°C во вращающихся печах — один из самых горячих промышленных процессов — и должны точно контролировать температуру по всей длине печи.
Сравнение производительности и интенсивности CO₂ рассчитано на основе данных промышленных объектов Climate TRACE; роль сектора основана на инженерных справочниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Sharjah Cement Factory. All facilities by this operator →
Al Saajah Cement Plant sits in a hot desert climate zone (Köppen BWh), at 25.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 12 cement plants in United Arab Emirates by reported capacity.
Coordinates 25.29706, 55.61827. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Al Saajah Cement Plant is a cement plant in United Arab Emirates. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Al Saajah Cement Plant has a reported capacity of 4,270,000 t of cement.
Al Saajah Cement Plant emits about 1,360,845 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 317,213 cars. That ranks #11 among tracked facilities in United Arab Emirates.
Al Saajah Cement Plant is in United Arab Emirates, near coordinates 25.29706, 55.61827.
Al Saajah Cement Plant is operated by Sharjah Cement Factory.