Home / Asia / Saudi Arabia / Cement plants / Al Muzahimiyah Grey Cement Plant

Al Muzahimiyah Grey Cement Plant

Cement Plant in Saudi Arabia. Approximate location 24.29179, 46.3059.

Cement PlantSaudi ArabiaCO₂ reported

Al Muzahimiyah Grey Cement Plant is a cement plant in Saudi Arabia with a reported capacity of 4,229,167 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Riyadh Cement Company SJSC. By capacity it ranks #9 of 19 cement plants tracked in Saudi Arabia. It emits about 1,479,345 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 344,836 cars.

4,229,167t of cement
1,479,345t CO₂e / yr (Climate TRACE)
#30CO₂ rank in Saudi Arabia
0.35t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547378.

В контексте: как это предприятие сравнивается

На мощности 4,229,167 t of cement Al Muzahimiyah Grey Cement Plant — это примерно медианная cement plant в Saudi Arabia (4,000,000 t of cement). Подсектор: cement. Как cement plant, оно требует высокотемпературного технологического тепла (обычно 800–1400°C) для основных промышленных операций — тепла, которое должно подаваться котлами, печами или прямым сжиганием, и потери через неизолированные сосуды и трубопроводы представляют потраченное впустую топливо. Съёмная модульная теплоизоляция может снизить эти потери на 80–96%, охладив поверхность оборудования до ≤45°C, с окупаемостью часто менее 2 лет. Цементные заводы нагревают известняк до 1400°C во вращающихся печах — один из самых горячих промышленных процессов — и должны точно контролировать температуру по всей длине печи.

Сравнение производительности и интенсивности CO₂ рассчитано на основе данных промышленных объектов Climate TRACE; роль сектора основана на инженерных справочниках.

What 1,479,345 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

344,836cars driven for a year
192,924homes' annual energy use
24,655,750tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Saudi Arabia

Al Nabah Cement Plant: 10,000,000 t of cement10.0MAl Nabah C…Al Oyun Cement Plant: 9,700,000 t of cement9.7MAl Oyun Ce…Al Manakh Cement Plant: 7,960,000 t of cement8.0MAl Manakh …Rabigh Cement Plant: 6,000,000 t of cement6.0MRabigh Cem…Ahad Al Masarihah Cement Plant: 4,900,000 t of cement4.9MAhad Al Ma…Al Ardiyat Cement Plant: 4,900,000 t of cement4.9MAl Ardiyat…Bisha Cement Plant: 4,900,000 t of cement4.9MBisha Ceme…Dhubaya-Jumah Cement Plant: 4,400,000 t of cement4.4MDhubaya-Ju…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Riyadh Cement Company SJSC. All facilities by this operator →

Local climate

Al Muzahimiyah Grey Cement Plant sits in a hot desert climate zone (Köppen BWh), at 24.3°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #9 largest of 19 cement plants in Saudi Arabia by reported capacity.

Nearby industrial sites

Location

Coordinates 24.29179, 46.3059. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Al Muzahimiyah Grey Cement Plant?

Al Muzahimiyah Grey Cement Plant is a cement plant in Saudi Arabia. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Al Muzahimiyah Grey Cement Plant?

Al Muzahimiyah Grey Cement Plant has a reported capacity of 4,229,167 t of cement.

How much CO₂ does Al Muzahimiyah Grey Cement Plant emit?

Al Muzahimiyah Grey Cement Plant emits about 1,479,345 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 344,836 cars. That ranks #30 among tracked facilities in Saudi Arabia.

Where is Al Muzahimiyah Grey Cement Plant located?

Al Muzahimiyah Grey Cement Plant is in Saudi Arabia, near coordinates 24.29179, 46.3059.

Who operates Al Muzahimiyah Grey Cement Plant?

Al Muzahimiyah Grey Cement Plant is operated by Riyadh Cement Company SJSC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.