Home / Europe / Bulgaria / Cement plants / Zlatna Panega Cement Plant

Zlatna Panega Cement Plant

Cement Plant in Bulgaria. Approximate location 43.08793, 24.17509.

Cement PlantBulgariaCO₂ reported

Zlatna Panega Cement Plant is a cement plant in Bulgaria with a reported capacity of 1,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Zlatna Panega Cement AD. By capacity it ranks #2 of 3 cement plants tracked in Bulgaria. It emits about 724,709 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 168,930 cars. Its CO₂ per unit of capacity is about 34% above the median cement plant.

1,500,000t of cement
724,709t CO₂e / yr (Climate TRACE)
#2CO₂ rank in Bulgaria
0.48t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437259.

Em contexto: como esta instalação se compara

Com 1,500,000 t of cement, Zlatna Panega Cement Plant é em torno de a mediana de cement plant em Bulgaria (1,500,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 74% acima de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.

Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.

What 724,709 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

168,930cars driven for a year
94,511homes' annual energy use
12,078,483tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Bulgaria

Beli Izvor Cement Plant: 1,700,000 t of cement1.7MBeli Izvor…Zlatna Panega Cement Plant: 1,500,000 t of cement1.5MZlatna Pan…Devnya Cement Plant: 1,500,000 t of cement1.5MDevnya Cem…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Zlatna Panega Cement AD. All facilities by this operator →

Local climate

Zlatna Panega Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 43.1°N in the northern hemisphere.

~18°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 3 cement plants in Bulgaria by reported capacity.

Nearby industrial sites

Location

Coordinates 43.08793, 24.17509. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Zlatna Panega Cement Plant?

Zlatna Panega Cement Plant is a cement plant in Bulgaria. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Zlatna Panega Cement Plant?

Zlatna Panega Cement Plant has a reported capacity of 1,500,000 t of cement.

How much CO₂ does Zlatna Panega Cement Plant emit?

Zlatna Panega Cement Plant emits about 724,709 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 168,930 cars. That ranks #2 among tracked facilities in Bulgaria.

Where is Zlatna Panega Cement Plant located?

Zlatna Panega Cement Plant is in Bulgaria, near coordinates 43.08793, 24.17509.

Who operates Zlatna Panega Cement Plant?

Zlatna Panega Cement Plant is operated by Zlatna Panega Cement AD.

Built from open public data; no personal information. Operate this site? Request a correction or removal.