Steel Plant in Brazil. Approximate location -20.58055, -43.96941.
Steel PlantBrazilCO₂ reported
Vallourec Jeceaba steel plant is a steel plant in Brazil with a reported capacity of 1,000,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Vallourec Solucoes Tubulares do Brasil SA. By capacity it ranks #10 of 22 steel plants tracked in Brazil. It emits about 525,338 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 122,456 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32440386.
Com 1,000,000 t of steel, Vallourec Jeceaba steel plant é em torno de a mediana de steel plant em Brazil (1,000,000 t of steel). Seu CO₂ por unidade de capacidade é aproximadamente 7% abaixo de a mediana de steel plant. Subsetor: iron-and-steel. Como steel plant, requer calor de processo intenso (tipicamente 800–1500°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As usinas de aço queimam carvão em altos-fornos ou usam arcos elétricos para derreter sucata; em ambos os casos, o metal fundido deve ser mantido acima de 1.500°C e transferido através de tubulações e vasos de calor extensos.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Vallourec Solucoes Tubulares do Brasil SA. All facilities by this operator →
Vallourec Jeceaba steel plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 20.6°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #10 largest of 22 steel plants in Brazil by reported capacity.
Coordinates -20.58055, -43.96941. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Vallourec Jeceaba steel plant is a steel plant in Brazil. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Vallourec Jeceaba steel plant has a reported capacity of 1,000,000 t of steel.
Vallourec Jeceaba steel plant emits about 525,338 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 122,456 cars. That ranks #55 among tracked facilities in Brazil.
Vallourec Jeceaba steel plant is in Brazil, near coordinates -20.58055, -43.96941.
Vallourec Jeceaba steel plant is operated by Vallourec Solucoes Tubulares do Brasil SA.