Cement Plant in Switzerland. Approximate location 46.91711, 9.55104.
Cement PlantSwitzerlandCO₂ reported
Untervaz Cement Plant is a cement plant in Switzerland with a reported capacity of 800,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim (Schweiz) AG. By capacity it ranks #3 of 6 cement plants tracked in Switzerland. It emits about 356,766 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 83,162 cars. Its CO₂ per unit of capacity is about 24% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437353.
Com 800,000 t of cement, Untervaz Cement Plant é em torno de a mediana de cement plant em Switzerland (800,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 44% acima de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Holcim (Schweiz) AG. All facilities by this operator →
Untervaz Cement Plant sits in a polar tundra climate zone (Köppen ET), at 46.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 6 cement plants in Switzerland by reported capacity.
Coordinates 46.91711, 9.55104. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Untervaz Cement Plant is a cement plant in Switzerland. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Untervaz Cement Plant has a reported capacity of 800,000 t of cement.
Untervaz Cement Plant emits about 356,766 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 83,162 cars. That ranks #2 among tracked facilities in Switzerland.
Untervaz Cement Plant is in Switzerland, near coordinates 46.91711, 9.55104.
Untervaz Cement Plant is operated by Holcim (Schweiz) AG.