Home / Asia / India / Cement plants / UltraTech Baga Cement Plant

UltraTech Baga Cement Plant

Cement Plant in India. Approximate location 31.32833, 76.89453.

Cement PlantIndiaCO₂ reported

UltraTech Baga Cement Plant is a cement plant in India with a reported capacity of 2,540,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by UltraTech Cement Ltd. By capacity it ranks #78 of 160 cement plants tracked in India. It emits about 653,202 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 152,262 cars. Its CO₂ per unit of capacity is about 29% below the median cement plant.

2,540,000t of cement
653,202t CO₂e / yr (Climate TRACE)
#189CO₂ rank in India
0.26t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897073.

Em contexto: como esta instalação se compara

Com 2,540,000 t of cement, UltraTech Baga Cement Plant é em torno de a mediana de cement plant em India (2,500,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 32% abaixo de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.

Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.

What 653,202 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

152,262cars driven for a year
85,185homes' annual energy use
10,886,700tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in India

UltraTech Anantapuram Cement Plant: 9,000,000 t of cement9.0MUltraTech …UltraTech Nrupathanga Cement Plant: 8,700,000 t of cement8.7MUltraTech …Kesoram Industries Gulbarga Cement Plant: 8,650,000 t of cement8.6MKesoram In…Wonder Cement Nimbahera Cement Plant: 8,000,000 t of cement8.0MWonder Cem…UltraTech Adityapuram Cement Plant: 8,000,000 t of cement8.0MUltraTech …Ambuja Cements Suli/Rauri Cement Plant: 6,800,000 t of cement6.8MAmbuja Cem…UltraTech Vikram Nagar Cement Plant: 6,670,000 t of cement6.7MUltraTech …Prism Johnson Mankahari Cement Plant: 6,600,000 t of cement6.6MPrism John…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by UltraTech Cement Ltd. All facilities by this operator →

Local climate

UltraTech Baga Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 31.3°N in the northern hemisphere.

~19°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical (dry winter): hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #78 largest of 160 cement plants in India by reported capacity.

Nearby industrial sites

Location

Coordinates 31.32833, 76.89453. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is UltraTech Baga Cement Plant?

UltraTech Baga Cement Plant is a cement plant in India. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of UltraTech Baga Cement Plant?

UltraTech Baga Cement Plant has a reported capacity of 2,540,000 t of cement.

How much CO₂ does UltraTech Baga Cement Plant emit?

UltraTech Baga Cement Plant emits about 653,202 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 152,262 cars. That ranks #189 among tracked facilities in India.

Where is UltraTech Baga Cement Plant located?

UltraTech Baga Cement Plant is in India, near coordinates 31.32833, 76.89453.

Who operates UltraTech Baga Cement Plant?

UltraTech Baga Cement Plant is operated by UltraTech Cement Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.