Trebaczew Cement Plant

Cement Plant in Poland. Approximate location 51.10966, 18.94393.

Cement PlantPolandCO₂ reported

Trebaczew Cement Plant is a cement plant in Poland with a reported capacity of 2,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Cementownia Warta SA. By capacity it ranks #4 of 10 cement plants tracked in Poland. It emits about 1,195,359 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 278,638 cars. Its CO₂ per unit of capacity is about 66% above the median cement plant.

2,000,000t of cement
1,195,359t CO₂e / yr (Climate TRACE)
#5CO₂ rank in Poland
0.60t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439028.

Em contexto: como esta instalação se compara

Com 2,000,000 t of cement, Trebaczew Cement Plant é em torno de a mediana de cement plant em Poland (2,000,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 113% acima de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.

Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.

What 1,195,359 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

278,638cars driven for a year
155,889homes' annual energy use
19,922,650tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Poland

Chelm Cement Plant: 3,000,000 t of cement3.0MChelm Ceme…Chorula Cement Plant: 3,000,000 t of cement3.0MChorula Ce…Piechcen Cement Plant: 2,470,000 t of cement2.5MPiechcen C…Trebaczew Cement Plant: 2,000,000 t of cement2.0MTrebaczew …Malogogszcz Cement Plant: 2,000,000 t of cement2.0MMalogogszc…Karsy Cement Plant: 1,840,000 t of cement1.8MKarsy Ceme…nowiny Cement Plant: 1,600,000 t of cement1.6Mnowiny Cem…Rudniki Cement Plant: 1,200,000 t of cement1.2MRudniki Ce…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Cementownia Warta SA. All facilities by this operator →

Local climate

Trebaczew Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 51.1°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #4 largest of 10 cement plants in Poland by reported capacity.

Nearby industrial sites

Location

Coordinates 51.10966, 18.94393. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Trebaczew Cement Plant?

Trebaczew Cement Plant is a cement plant in Poland. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Trebaczew Cement Plant?

Trebaczew Cement Plant has a reported capacity of 2,000,000 t of cement.

How much CO₂ does Trebaczew Cement Plant emit?

Trebaczew Cement Plant emits about 1,195,359 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 278,638 cars. That ranks #5 among tracked facilities in Poland.

Where is Trebaczew Cement Plant located?

Trebaczew Cement Plant is in Poland, near coordinates 51.10966, 18.94393.

Who operates Trebaczew Cement Plant?

Trebaczew Cement Plant is operated by Cementownia Warta SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.