Home / Europe / United Kingdom / Cement plants / Rugby Cement Plant

Rugby Cement Plant

Cement Plant in United Kingdom. Approximate location 52.37733, -1.28463.

Cement PlantUnited KingdomCO₂ reported

Rugby Cement Plant is a cement plant in United Kingdom with a reported capacity of 1,800,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by CEMEX UK Cement Ltd. By capacity it ranks #1 of 10 cement plants tracked in United Kingdom. It emits about 456,610 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 106,436 cars. Its CO₂ per unit of capacity is about 30% below the median cement plant.

1,800,000t of cement
456,610t CO₂e / yr (Climate TRACE)
#14CO₂ rank in United Kingdom
0.25t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438462.

Em contexto: como esta instalação se compara

Com 1,800,000 t of cement, Rugby Cement Plant é bem acima de a mediana de cement plant em United Kingdom (1,000,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 37% abaixo de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.

Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.

What 456,610 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

106,436cars driven for a year
59,547homes' annual energy use
7,610,167tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in United Kingdom

Rugby Cement Plant: 1,800,000 t of cement1.8MRugby Ceme…Hope Cement Plant: 1,500,000 t of cement1.5MHope Cemen…Ribblesdale Cement Plant: 1,300,000 t of cement1.3MRibblesdal…Ketton Cement Plant: 1,300,000 t of cement1.3MKetton Cem…Tunstead Cement Plant: 1,000,000 t of cement1000kTunstead C…Dunbar Cement Plant: 1,000,000 t of cement1000kDunbar Cem…Padeswood Cement Plant: 1,000,000 t of cement1000kPadeswood …Cauldon Cement Plant: 960,000 t of cement960kCauldon Ce…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by CEMEX UK Cement Ltd. All facilities by this operator →

Local climate

Rugby Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 52.4°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #1 largest of 10 cement plants in United Kingdom by reported capacity.

Nearby industrial sites

Location

Coordinates 52.37733, -1.28463. View on OpenStreetMap.

Heat loss & insulation profile

A cement plant like this runs hot equipment that sheds heat continuously: rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves (surface/process temperatures around 200–1,000 °C). These surfaces lose energy to the air year-round; removable modular insulation cuts that loss, brings outer surfaces to ≤45 °C, and unclips for inspection.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

On an already-insulated site (pipes & valves in cladding / jackets), closing the remaining gaps, flanges and damaged sections and switching to removable covers indicatively recovers about 10,000 MWh/yr (≈ 3,500 t CO₂/yr) — scaled to this site's reported CO₂ within its sector. Bare or damaged surfaces recover several times more.

See Inzonex insulation → Estimate your site →

Indicative, not a measurement. Conservative floor for an already-insulated plant; a TIPCHECK on-site audit gives a measured figure. Industry context: EiiF TIPCHECK — industrial insulation can save ~14 Mtoe/yr in EU, payback typically <2 years.

Safety & the no-regret first step

Bare hot surfaces here exceed the touch-safe limit (EN ISO 13732-1); insulation to ≤45 °C is a worker-safety and compliance win. And before electrification, fuel-switching or CCS, eliminating surface heat loss is the cheapest, fastest, lowest-risk step — audit the bare spots first, rip-and-replace later.

United Kingdom: funding & obligation

Funding. Grants for industrial energy efficiency / deep decarbonization in England, Wales, NI; min grant lowered to GBP 75k for SMEs.

Obligation. Mandatory for 'large undertakings': >=250 employees OR turnover >GBP 36M and balance sheet >GBP 18M. Qualification date 31 Dec 2026; compliance notification by 5 Dec 2027. (applies as a rule above the stated threshold — we don't hold this site's metered energy use).

Verified 2026; confirm current scheme terms before applying.

Frequently asked questions

What type of facility is Rugby Cement Plant?

Rugby Cement Plant is a cement plant in United Kingdom. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Rugby Cement Plant?

Rugby Cement Plant has a reported capacity of 1,800,000 t of cement.

How much CO₂ does Rugby Cement Plant emit?

Rugby Cement Plant emits about 456,610 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 106,436 cars. That ranks #14 among tracked facilities in United Kingdom.

Where is Rugby Cement Plant located?

Rugby Cement Plant is in United Kingdom, near coordinates 52.37733, -1.28463.

Who operates Rugby Cement Plant?

Rugby Cement Plant is operated by CEMEX UK Cement Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.