Home / Africa / Egypt / Cement plants / MBCC New Bani Suef Cement Plant

MBCC New Bani Suef Cement Plant

Cement Plant in Egypt. Approximate location 28.9235, 31.07917.

Cement PlantEgyptCO₂ reported

MBCC New Bani Suef Cement Plant is a cement plant in Egypt with a reported capacity of 3,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Misr Beni Suef Cement Co SAE. By capacity it ranks #11 of 26 cement plants tracked in Egypt. It emits about 821,762 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 191,553 cars. Its CO₂ per unit of capacity is about 24% below the median cement plant.

3,000,000t of cement
821,762t CO₂e / yr (Climate TRACE)
#26CO₂ rank in Egypt
0.27t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896684.

Em contexto: como esta instalação se compara

Com 3,000,000 t of cement, MBCC New Bani Suef Cement Plant é em torno de a mediana de cement plant em Egypt (2,690,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 24% abaixo de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.

Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.

What 821,762 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

191,553cars driven for a year
107,168homes' annual energy use
13,696,033tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Egypt

National Cement New Beni Suef Cement Plant: 12,000,000 t of cement12.0MNational C…Lafarge Attaka Cement Plant: 10,200,000 t of cement10.2MLafarge At…Helwan Cement Plant: 8,000,000 t of cement8.0MHelwan Cem…National Cement El Hassana Cement Plant: 7,000,000 t of cement7.0MNational C…Assiuit Cement Asyut Plant: 5,700,000 t of cement5.7MAssiuit Ce…Arabian Cement Attaka Plant: 5,000,000 t of cement5.0MArabian Ce…Borg El Arab Cement Plant: 4,800,000 t of cement4.8MBorg El Ar…Tura Cement Plant: 4,000,000 t of cement4.0MTura Cemen…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Misr Beni Suef Cement Co SAE. All facilities by this operator →

Local climate

MBCC New Bani Suef Cement Plant sits in a hot desert climate zone (Köppen BWh), at 28.9°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #11 largest of 26 cement plants in Egypt by reported capacity.

Nearby industrial sites

Location

Coordinates 28.9235, 31.07917. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is MBCC New Bani Suef Cement Plant?

MBCC New Bani Suef Cement Plant is a cement plant in Egypt. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of MBCC New Bani Suef Cement Plant?

MBCC New Bani Suef Cement Plant has a reported capacity of 3,000,000 t of cement.

How much CO₂ does MBCC New Bani Suef Cement Plant emit?

MBCC New Bani Suef Cement Plant emits about 821,762 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 191,553 cars. That ranks #26 among tracked facilities in Egypt.

Where is MBCC New Bani Suef Cement Plant located?

MBCC New Bani Suef Cement Plant is in Egypt, near coordinates 28.9235, 31.07917.

Who operates MBCC New Bani Suef Cement Plant?

MBCC New Bani Suef Cement Plant is operated by Misr Beni Suef Cement Co SAE.

Built from open public data; no personal information. Operate this site? Request a correction or removal.