Cement Plant in Laos. Approximate location 18.88136, 102.4807.
Cement PlantLaosCO₂ reported
Lao Cement Vang Vieng III Cement Plant is a cement plant in Laos with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Lao Cement PCL. By capacity it ranks #7 of 10 cement plants tracked in Laos. It emits about 410,449 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 95,676 cars. Its CO₂ per unit of capacity is about 14% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547350.
Com 1,000,000 t of cement, Lao Cement Vang Vieng III Cement Plant é abaixo de a mediana de cement plant em Laos (1,500,000 t of cement). Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Lao Cement PCL. All facilities by this operator →
Lao Cement Vang Vieng III Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 18.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #7 largest of 10 cement plants in Laos by reported capacity.
Coordinates 18.88136, 102.4807. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Lao Cement Vang Vieng III Cement Plant is a cement plant in Laos. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Lao Cement Vang Vieng III Cement Plant has a reported capacity of 1,000,000 t of cement.
Lao Cement Vang Vieng III Cement Plant emits about 410,449 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 95,676 cars. That ranks #7 among tracked facilities in Laos.
Lao Cement Vang Vieng III Cement Plant is in Laos, near coordinates 18.88136, 102.4807.
Lao Cement Vang Vieng III Cement Plant is operated by Lao Cement PCL.