Cement Plant in Belarus. Approximate location 53.26438, 24.4441.
Cement PlantBelarusCO₂ reported
Krasnoselskstroymaterialy Cement Plant is a cement plant in Belarus with a reported capacity of 1,600,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Krasnoselskstroymaterialy OJSC. By capacity it ranks #2 of 3 cement plants tracked in Belarus. It emits about 547,460 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 127,613 cars. Its CO₂ per unit of capacity is about 5% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437264.
Com 1,600,000 t of cement, Krasnoselskstroymaterialy Cement Plant é em torno de a mediana de cement plant em Belarus (1,600,000 t of cement). Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Krasnoselskstroymaterialy OJSC. All facilities by this operator →
Krasnoselskstroymaterialy Cement Plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 53.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 3 cement plants in Belarus by reported capacity.
Coordinates 53.26438, 24.4441. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Krasnoselskstroymaterialy Cement Plant is a cement plant in Belarus. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Krasnoselskstroymaterialy Cement Plant has a reported capacity of 1,600,000 t of cement.
Krasnoselskstroymaterialy Cement Plant emits about 547,460 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 127,613 cars. That ranks #5 among tracked facilities in Belarus.
Krasnoselskstroymaterialy Cement Plant is in Belarus, near coordinates 53.26438, 24.4441.
Krasnoselskstroymaterialy Cement Plant is operated by Krasnoselskstroymaterialy OJSC.