Cement Plant in Turkmenistan. Approximate location 39.68401, 54.30231.
Cement PlantTurkmenistanCO₂ reported
Jebel Cement Plant is a cement plant in Turkmenistan with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Ministry of Industry and Construction Production (Turkmenistan). By capacity it ranks #3 of 4 cement plants tracked in Turkmenistan. It emits about 530,823 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 123,735 cars. Its CO₂ per unit of capacity is about 47% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897836.
Com 1,000,000 t of cement, Jebel Cement Plant é abaixo de a mediana de cement plant em Turkmenistan (2,000,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 12% abaixo de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Ministry of Industry and Construction Production (Turkmenistan). All facilities by this operator →
Jebel Cement Plant sits in a cold desert climate zone (Köppen BWk), at 39.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 4 cement plants in Turkmenistan by reported capacity.
Coordinates 39.68401, 54.30231. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Jebel Cement Plant is a cement plant in Turkmenistan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Jebel Cement Plant has a reported capacity of 1,000,000 t of cement.
Jebel Cement Plant emits about 530,823 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 123,735 cars. That ranks #5 among tracked facilities in Turkmenistan.
Jebel Cement Plant is in Turkmenistan, near coordinates 39.68401, 54.30231.
Jebel Cement Plant is operated by Ministry of Industry and Construction Production (Turkmenistan).