Cement Plant in Azerbaijan. Approximate location 40.22469, 49.55794.
Cement PlantAzerbaijanCO₂ reported
Holcim Garadagh Cement Plant is a cement plant in Azerbaijan with a reported capacity of 1,700,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim (Azerbaijan) OJSC. By capacity it ranks #2 of 3 cement plants tracked in Azerbaijan. It emits about 388,063 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 90,458 cars. Its CO₂ per unit of capacity is about 37% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895164.
Com 1,700,000 t of cement, Holcim Garadagh Cement Plant é em torno de a mediana de cement plant em Azerbaijan (1,700,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 31% abaixo de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Holcim (Azerbaijan) OJSC. All facilities by this operator →
Holcim Garadagh Cement Plant sits in a cold semi-arid steppe climate zone (Köppen BSk), at 40.2°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 3 cement plants in Azerbaijan by reported capacity.
Coordinates 40.22469, 49.55794. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Holcim Garadagh Cement Plant is a cement plant in Azerbaijan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Holcim Garadagh Cement Plant has a reported capacity of 1,700,000 t of cement.
Holcim Garadagh Cement Plant emits about 388,063 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 90,458 cars. That ranks #4 among tracked facilities in Azerbaijan.
Holcim Garadagh Cement Plant is in Azerbaijan, near coordinates 40.22469, 49.55794.
Holcim Garadagh Cement Plant is operated by Holcim (Azerbaijan) OJSC.