Home / Europe / Germany / Cement plants / Heidelberg Geseke Cement Plant

Heidelberg Geseke Cement Plant

Cement Plant in Germany. Approximate location 51.6186, 8.51082.

Cement PlantGermanyCO₂ reported

Heidelberg Geseke Cement Plant is a cement plant in Germany with a reported capacity of 900,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Heidelberg Materials AG. By capacity it ranks #21 of 32 cement plants tracked in Germany. It emits about 159,451 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 37,168 cars. Its CO₂ per unit of capacity is about 51% below the median cement plant.

900,000t of cement
159,451t CO₂e / yr (Climate TRACE)
#82CO₂ rank in Germany
0.18t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438323.

Em contexto: como esta instalação se compara

Com 900,000 t of cement, Heidelberg Geseke Cement Plant é em torno de a mediana de cement plant em Germany (1,000,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 44% abaixo de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.

Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.

What 159,451 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

37,168cars driven for a year
20,794homes' annual energy use
2,657,517tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Germany

Deuna Cement Plant: 2,000,000 t of cement2.0MDeuna Ceme…Rudersdorf Cement Plant: 1,900,000 t of cement1.9MRudersdorf…Lengerich Cement Plant: 1,770,000 t of cement1.8MLengerich …Karsdorf Cement Plant: 1,400,000 t of cement1.4MKarsdorf C…Schelklingen Cement Plant: 1,400,000 t of cement1.4MSchelkling…Lagerdorf Cement Plant: 1,310,000 t of cement1.3MLagerdorf …Beckum-Kollenbach Cement Plant: 1,250,000 t of cement1.2MBeckum-Kol…Karlstadt Cement Plant: 1,200,000 t of cement1.2MKarlstadt …

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Heidelberg Materials AG. All facilities by this operator →

Local climate

Heidelberg Geseke Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 51.6°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #21 largest of 32 cement plants in Germany by reported capacity.

Nearby industrial sites

Location

Coordinates 51.6186, 8.51082. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Heidelberg Geseke Cement Plant?

Heidelberg Geseke Cement Plant is a cement plant in Germany. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Heidelberg Geseke Cement Plant?

Heidelberg Geseke Cement Plant has a reported capacity of 900,000 t of cement.

How much CO₂ does Heidelberg Geseke Cement Plant emit?

Heidelberg Geseke Cement Plant emits about 159,451 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 37,168 cars. That ranks #82 among tracked facilities in Germany.

Where is Heidelberg Geseke Cement Plant located?

Heidelberg Geseke Cement Plant is in Germany, near coordinates 51.6186, 8.51082.

Who operates Heidelberg Geseke Cement Plant?

Heidelberg Geseke Cement Plant is operated by Heidelberg Materials AG.

Built from open public data; no personal information. Operate this site? Request a correction or removal.