Cement Plant in Pakistan. Approximate location 33.80184, 72.09547.
Cement PlantPakistanCO₂ reported
Fauji Cement Nizampur Cement Plant is a cement plant in Pakistan with a reported capacity of 3,750,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Fauji Cement Co Ltd. By capacity it ranks #8 of 31 cement plants tracked in Pakistan. It emits about 2,063,502 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 481,003 cars. Its CO₂ per unit of capacity is about 53% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897606.
Com 3,750,000 t of cement, Fauji Cement Nizampur Cement Plant é bem acima de a mediana de cement plant em Pakistan (2,300,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 20% acima de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Fauji Cement Co Ltd. All facilities by this operator →
Fauji Cement Nizampur Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 33.8°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #8 largest of 31 cement plants in Pakistan by reported capacity.
Coordinates 33.80184, 72.09547. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Fauji Cement Nizampur Cement Plant is a cement plant in Pakistan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Fauji Cement Nizampur Cement Plant has a reported capacity of 3,750,000 t of cement.
Fauji Cement Nizampur Cement Plant emits about 2,063,502 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 481,003 cars. That ranks #6 among tracked facilities in Pakistan.
Fauji Cement Nizampur Cement Plant is in Pakistan, near coordinates 33.80184, 72.09547.
Fauji Cement Nizampur Cement Plant is operated by Fauji Cement Co Ltd.