Cement Plant in Nigeria. Approximate location 6.90458, 3.20583.
Cement PlantNigeriaCO₂ reported
Ewekoro 2 Cement Plant is a cement plant in Nigeria with a reported capacity of 2,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Lafarge Africa PLC. By capacity it ranks #8 of 10 cement plants tracked in Nigeria. It emits about 1,037,150 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 241,760 cars. Its CO₂ per unit of capacity is about 15% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438961.
Com 2,500,000 t of cement, Ewekoro 2 Cement Plant é abaixo de a mediana de cement plant em Nigeria (7,339,667 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 14% acima de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Lafarge Africa PLC. All facilities by this operator →
Ewekoro 2 Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 6.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #8 largest of 10 cement plants in Nigeria by reported capacity.
Coordinates 6.90458, 3.20583. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Ewekoro 2 Cement Plant is a cement plant in Nigeria. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Ewekoro 2 Cement Plant has a reported capacity of 2,500,000 t of cement.
Ewekoro 2 Cement Plant emits about 1,037,150 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 241,760 cars. That ranks #11 among tracked facilities in Nigeria.
Ewekoro 2 Cement Plant is in Nigeria, near coordinates 6.90458, 3.20583.
Ewekoro 2 Cement Plant is operated by Lafarge Africa PLC.