Home / South America / Venezuela / Cement plants / Cerro Azul Cement Plant

Cerro Azul Cement Plant

Cement Plant in Venezuela. Approximate location 9.98541, -63.3122.

Cement PlantVenezuelaCO₂ reported

Cerro Azul Cement Plant is a cement plant in Venezuela with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Corporacion Socialista del Cemento. By capacity it ranks #6 of 10 cement plants tracked in Venezuela. It emits about 307,164 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 71,600 cars. Its CO₂ per unit of capacity is about 15% below the median cement plant.

1,000,000t of cement
307,164t CO₂e / yr (Climate TRACE)
#14CO₂ rank in Venezuela
0.31t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1898065.

Em contexto: como esta instalação se compara

Com 1,000,000 t of cement, Cerro Azul Cement Plant é em torno de a mediana de cement plant em Venezuela (1,210,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 23% abaixo de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.

Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.

What 307,164 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

71,600cars driven for a year
40,058homes' annual energy use
5,119,400tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Venezuela

San Sebastian Cement Plant: 2,710,000 t of cement2.7MSan Sebast…Pertigalete Cement Plant: 2,680,000 t of cement2.7MPertigalet…Cumarebo Cement Plant: 1,590,000 t of cement1.6MCumarebo C…Monay Cement Plant: 1,350,000 t of cement1.4MMonay Ceme…Ocumare Cement Plant: 1,210,000 t of cement1.2MOcumare Ce…Cerro Azul Cement Plant: 1,000,000 t of cement1000kCerro Azul…Mara Cement Plant: 730,000 t of cement730kMara Cemen…Jardin de Venezuela Cement Plant: 650,000 t of cement650kJardin de …

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Corporacion Socialista del Cemento. All facilities by this operator →

Local climate

Cerro Azul Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 10.0°N in the northern hemisphere.

~26°Ctypical annual mean
~29°Ctypical warm-season
Tropical savanna: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #6 largest of 10 cement plants in Venezuela by reported capacity.

Location

Coordinates 9.98541, -63.3122. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Cerro Azul Cement Plant?

Cerro Azul Cement Plant is a cement plant in Venezuela. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Cerro Azul Cement Plant?

Cerro Azul Cement Plant has a reported capacity of 1,000,000 t of cement.

How much CO₂ does Cerro Azul Cement Plant emit?

Cerro Azul Cement Plant emits about 307,164 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 71,600 cars. That ranks #14 among tracked facilities in Venezuela.

Where is Cerro Azul Cement Plant located?

Cerro Azul Cement Plant is in Venezuela, near coordinates 9.98541, -63.3122.

Who operates Cerro Azul Cement Plant?

Cerro Azul Cement Plant is operated by Corporacion Socialista del Cemento.

Built from open public data; no personal information. Operate this site? Request a correction or removal.