Home / Asia / United Arab Emirates / Steel plants / Arabian Gulf Steel Industries Abu Dhabi plant

Arabian Gulf Steel Industries Abu Dhabi plant

Steel Plant in United Arab Emirates. Approximate location 24.28168, 54.46202.

Steel PlantUnited Arab EmiratesCO₂ reported

Arabian Gulf Steel Industries Abu Dhabi plant is a steel plant in United Arab Emirates with a reported capacity of 1,200,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). By capacity it ranks #2 of 2 steel plants tracked in United Arab Emirates. It emits about 1,827,542 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 426,000 cars. Its CO₂ per unit of capacity is about 182% above the median steel plant.

1,200,000t of steel
1,827,542t CO₂e / yr (Climate TRACE)
#9CO₂ rank in United Arab Emirates
1.52t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42741840.

Em contexto: como esta instalação se compara

Com 1,200,000 t of steel, Arabian Gulf Steel Industries Abu Dhabi plant é abaixo de a mediana de steel plant em United Arab Emirates (3,600,000 t of steel). Subsetor: iron-and-steel. Como steel plant, requer calor de processo intenso (tipicamente 800–1500°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As usinas de aço queimam carvão em altos-fornos ou usam arcos elétricos para derreter sucata; em ambos os casos, o metal fundido deve ser mantido acima de 1.500°C e transferido através de tubulações e vasos de calor extensos.

Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.

What 1,827,542 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

426,000cars driven for a year
238,334homes' annual energy use
30,459,033tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in United Arab Emirates

Emsteel Abu Dhabi plant: 3,600,000 t of steel3.6MEmsteel Ab…Arabian Gulf Steel Industries Abu Dhabi plant: 1,200,000 t of steel1.2MArabian Gu…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Arabian Gulf Steel Industries Abu Dhabi plant sits in a hot desert climate zone (Köppen BWh), at 24.3°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 2 steel plants in United Arab Emirates by reported capacity.

Nearby industrial sites

Location

Coordinates 24.28168, 54.46202. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Arabian Gulf Steel Industries Abu Dhabi plant?

Arabian Gulf Steel Industries Abu Dhabi plant is a steel plant in United Arab Emirates. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Arabian Gulf Steel Industries Abu Dhabi plant?

Arabian Gulf Steel Industries Abu Dhabi plant has a reported capacity of 1,200,000 t of steel.

How much CO₂ does Arabian Gulf Steel Industries Abu Dhabi plant emit?

Arabian Gulf Steel Industries Abu Dhabi plant emits about 1,827,542 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 426,000 cars. That ranks #9 among tracked facilities in United Arab Emirates.

Where is Arabian Gulf Steel Industries Abu Dhabi plant located?

Arabian Gulf Steel Industries Abu Dhabi plant is in United Arab Emirates, near coordinates 24.28168, 54.46202.

Built from open public data; no personal information. Operate this site? Request a correction or removal.