Cement Plant in Saudi Arabia. Approximate location 24.27629, 37.56494.
Cement PlantSaudi ArabiaCO₂ reported
Al Nabah Cement Plant is a cement plant in Saudi Arabia with a reported capacity of 10,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Yanbu Cement Co. By capacity it ranks #1 of 19 cement plants tracked in Saudi Arabia. It emits about 3,461,521 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 806,881 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897769.
Com 10,000,000 t of cement, Al Nabah Cement Plant é bem acima de a mediana de cement plant em Saudi Arabia (4,000,000 t of cement). Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Yanbu Cement Co. All facilities by this operator →
Al Nabah Cement Plant sits in a hot desert climate zone (Köppen BWh), at 24.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 19 cement plants in Saudi Arabia by reported capacity.
Coordinates 24.27629, 37.56494. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Al Nabah Cement Plant is a cement plant in Saudi Arabia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Al Nabah Cement Plant has a reported capacity of 10,000,000 t of cement.
Al Nabah Cement Plant emits about 3,461,521 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 806,881 cars. That ranks #7 among tracked facilities in Saudi Arabia.
Al Nabah Cement Plant is in Saudi Arabia, near coordinates 24.27629, 37.56494.
Al Nabah Cement Plant is operated by Yanbu Cement Co.