Steel Plant in Saudi Arabia. Approximate location 26.27794, 49.94901.
Steel PlantSaudi ArabiaCO₂ reported
Al Ittefaq Arab Steel Dammam plant is a steel plant in Saudi Arabia with a reported capacity of 2,600,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Arab Steel Co. By capacity it ranks #2 of 6 steel plants tracked in Saudi Arabia. It emits about 1,306,009 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 304,431 cars. Its CO₂ per unit of capacity is about 7% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567042.
Com 2,600,000 t of steel, Al Ittefaq Arab Steel Dammam plant é bem acima de a mediana de steel plant em Saudi Arabia (1,200,000 t of steel). Seu CO₂ por unidade de capacidade é aproximadamente 8% abaixo de a mediana de steel plant. Subsetor: iron-and-steel. Como steel plant, requer calor de processo intenso (tipicamente 800–1500°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As usinas de aço queimam carvão em altos-fornos ou usam arcos elétricos para derreter sucata; em ambos os casos, o metal fundido deve ser mantido acima de 1.500°C e transferido através de tubulações e vasos de calor extensos.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Arab Steel Co. All facilities by this operator →
Al Ittefaq Arab Steel Dammam plant sits in a hot desert climate zone (Köppen BWh), at 26.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 6 steel plants in Saudi Arabia by reported capacity.
Coordinates 26.27794, 49.94901. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Al Ittefaq Arab Steel Dammam plant is a steel plant in Saudi Arabia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Al Ittefaq Arab Steel Dammam plant has a reported capacity of 2,600,000 t of steel.
Al Ittefaq Arab Steel Dammam plant emits about 1,306,009 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 304,431 cars. That ranks #37 among tracked facilities in Saudi Arabia.
Al Ittefaq Arab Steel Dammam plant is in Saudi Arabia, near coordinates 26.27794, 49.94901.
Al Ittefaq Arab Steel Dammam plant is operated by Arab Steel Co.