Cement Plant in United Arab Emirates. Approximate location 25.38703, 55.96714.
Cement PlantUnited Arab EmiratesCO₂ reported
Al Ghayl Cement Plant is a cement plant in United Arab Emirates with a reported capacity of 1,200,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Pioneer Cement Industries LLC. By capacity it ranks #10 of 12 cement plants tracked in United Arab Emirates. It emits about 610,523 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 142,313 cars. Its CO₂ per unit of capacity is about 41% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437209.
Com 1,200,000 t of cement, Al Ghayl Cement Plant é abaixo de a mediana de cement plant em United Arab Emirates (2,700,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 26% acima de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Pioneer Cement Industries LLC. All facilities by this operator →
Al Ghayl Cement Plant sits in a hot desert climate zone (Köppen BWh), at 25.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #10 largest of 12 cement plants in United Arab Emirates by reported capacity.
Coordinates 25.38703, 55.96714. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Al Ghayl Cement Plant is a cement plant in United Arab Emirates. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Al Ghayl Cement Plant has a reported capacity of 1,200,000 t of cement.
Al Ghayl Cement Plant emits about 610,523 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 142,313 cars. That ranks #17 among tracked facilities in United Arab Emirates.
Al Ghayl Cement Plant is in United Arab Emirates, near coordinates 25.38703, 55.96714.
Al Ghayl Cement Plant is operated by Pioneer Cement Industries LLC.