Steel Plant in Bangladesh. Approximate location 22.47052, 91.73551.
Steel PlantBangladeshCO₂ reported
Abul Khair Steel Sitakunda plant is a steel plant in Bangladesh with a reported capacity of 1,400,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Abul Khair Steel Ltd. By capacity it ranks #3 of 5 steel plants tracked in Bangladesh. It emits about 254,428 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 59,307 cars. Its CO₂ per unit of capacity is about 66% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566438.
Com 1,400,000 t of steel, Abul Khair Steel Sitakunda plant é em torno de a mediana de steel plant em Bangladesh (1,400,000 t of steel). Seu CO₂ por unidade de capacidade é aproximadamente 43% abaixo de a mediana de steel plant. Subsetor: iron-and-steel. Como steel plant, requer calor de processo intenso (tipicamente 800–1500°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As usinas de aço queimam carvão em altos-fornos ou usam arcos elétricos para derreter sucata; em ambos os casos, o metal fundido deve ser mantido acima de 1.500°C e transferido através de tubulações e vasos de calor extensos.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Abul Khair Steel Ltd. All facilities by this operator →
Abul Khair Steel Sitakunda plant sits in a tropical monsoon climate zone (Köppen Am), at 22.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 5 steel plants in Bangladesh by reported capacity.
Coordinates 22.47052, 91.73551. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Abul Khair Steel Sitakunda plant is a steel plant in Bangladesh. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Abul Khair Steel Sitakunda plant has a reported capacity of 1,400,000 t of steel.
Abul Khair Steel Sitakunda plant emits about 254,428 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 59,307 cars. That ranks #8 among tracked facilities in Bangladesh.
Abul Khair Steel Sitakunda plant is in Bangladesh, near coordinates 22.47052, 91.73551.
Abul Khair Steel Sitakunda plant is operated by Abul Khair Steel Ltd.