Home / South America / Paraguay / Cement plants / Vallemi Cement Plant

Vallemi Cement Plant

Cement Plant in Paraguay. Approximate location -22.17334, -57.95551.

Cement PlantParaguayCO₂ estimate (modelled)

Vallemi Cement Plant is a cement plant in Paraguay. Its listed capacity is 1,060,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Industria Nacional del Cemento SA. By capacity it ranks #1 among 2 cement plants in Paraguay. It emits about 472,041 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 110k passenger cars. Its CO₂ per unit of capacity is 23% above the national median for this sector.

1,060,000t of cement
472,041t CO₂e / yr (Climate TRACE)
#1CO₂ rank in Paraguay
0.45t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439045.

Data status

Known source data

FacilityVallemi Cement Plant Climate TRACE
CountryParaguay Climate TRACE
Coordinates-22.17334, -57.95551 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity1,060,000 t of cement Climate TRACE
Owner / operatorIndustria Nacional del Cemento SA Climate TRACE
Modelled CO₂e472,041 t/yr Climate TRACE

Calculated from the dataset

Paraguay rank#1 of 4 · top 25.0% calculated
Global cement rank#1226 of 2113 · top 58.0% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

In context: how this facility compares

At 1,060,000 t of cement, Vallemi Cement Plant is around the median cement plant in Paraguay (1,060,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 472,041 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

110kcars driven for a year
62khomes' annual energy use
7.9 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 472k t CO₂e/yr (Scope 1), Vallemi Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 472k t at the EU CBAM rate (€75/t) is €35.6M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈9k t–24k t/yr, worth €711k€1.8M, with payback up to 2 years. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

472k t CO₂e / yrScope 1 emissions
€35.6M/yrCBAM exposure on EU exports
9k t–24k t/yr ≈ €711k€1.8MDecarbonization potential

Carbon price: EU CBAM €75/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Capacity vs largest cement plants in Paraguay

Vallemi Cement Plant: 1,060,000 t of cement1.1MVallemi Ce…Villa Hayes Cement Plant: 750,000 t of cement750kVilla Haye…

Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Industria Nacional del Cemento SA.

Local climate

Vallemi Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 22.2°S in the southern hemisphere.

~26°Ctypical annual mean
~29°Ctypical warm-season
Tropical savanna: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #1 largest of 2 cement plants in Paraguay by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates -22.17334, -57.95551. View on OpenStreetMap.

Heat loss & insulation profile

For a cement plant, the main modular-insulation targets are rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves. Typical hot-surface ranges used for screening: 200–1,000 °C.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

A first-pass insulation screen suggests about 10,000 MWh/year of recoverable heat-loss reduction and about 3,500 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

External climate finance your country can access

For energy-efficiency projects around process heat, likely external funding channels include:

Sources: country climate-finance facilities and public development-bank programmes.

Frequently asked questions

What type of facility is Vallemi Cement Plant?

Vallemi Cement Plant is a cement plant in Paraguay. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Vallemi Cement Plant?

The open dataset lists 1,060,000 t of cement of capacity for Vallemi Cement Plant.

How much CO₂ does Vallemi Cement Plant emit?

The page uses about 472,041 t CO₂e/year from the open dataset It ranks #1 among facilities in Paraguay by estimated CO₂.

Where is Vallemi Cement Plant located?

Vallemi Cement Plant is in Paraguay at approximately -22.17334, -57.95551.

Who operates Vallemi Cement Plant?

The operator recorded in the open dataset is Industria Nacional del Cemento SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.