U. S. Steel Košice steel plant — Slovakia
Steel Plant in Slovakia. Approximate location 48.61808, 21.20077.
Steel PlantSlovakiaCO₂ estimate (modelled)
U. S. Steel Košice steel plant is a steel plant in Slovakia. Its listed capacity is 4,500,000 t of steel. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by US Steel Košice sro. It emits about 5,155,752 t CO₂e a year from Climate TRACE. That is 45% of the CO₂e from the 19 facilities in Slovakia that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 23% above the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567051.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Xinji Aosen Iron and Steel Group Co Ltd · 5,181,824 t CO₂e/yr · China
- Alliance Steel Kuantan plant · 5,127,624 t CO₂e/yr · Malaysia
- Yangzhou Hengrun Ocean Heavy Industry Co Ltd · 5,066,326 t CO₂e/yr · China
- Cleveland-Cliffs Dearborn steel plant · 5,263,134 t CO₂e/yr · United States
- Zhuhai Yueyufeng Iron and Steel Co Ltd · 5,022,268 t CO₂e/yr · China
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- U.S. Steel Kosice Works power station · Coal · 208 MW · 1 km
- Kosice power station · Gas · 37 MW · 10 km
- Ruzin Pumped Storage Hydroelectric Power plant Slovakia · Hydro · 60 MW · 28 km
- Trebisov power station · Coal · 885 MW · 38 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 4,500,000 t of steel, U. S. Steel Košice steel plant is around the median steel plant in Slovakia (4,500,000 t of steel). Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 5,155,752 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 5.2M t CO₂e/yr (Scope 1), U. S. Steel Košice steel plant carries €440M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.
Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by US Steel Košice sro.
Local climate
U. S. Steel Košice steel plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 48.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1416 W/m² to ambient — roughly 1.09× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Carmeuse Slovakia, S.R.O. - Závod Vápenka Košice · Lime Plant · 392,168 t CO₂
- Dvorniky Vcelare Cement Plant · Cement Plant · 478,387 t CO₂
- Bukocel a.s. Pulpmill - Bukóza Holding Pulp Mill · Pulp & Paper Mill · 81,064 t CO₂
- HUN-Kazincbarcikai_ammonia · Chemical Plant · 300,403 t CO₂
- Kiralyegyhaza Cement Plant · Cement Plant · 259,310 t CO₂
- Tiszai Vegyi Kombinat Ltd., Tiszaujvaros · Petrochemical · 969,582 t CO₂
Location
Coordinates 48.61808, 21.20077. View on OpenStreetMap.
Frequently asked questions
What type of facility is U. S. Steel Košice steel plant?
U. S. Steel Košice steel plant is a steel plant in Slovakia. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
What capacity is listed for U. S. Steel Košice steel plant?
The open dataset lists 4,500,000 t of steel of capacity for U. S. Steel Košice steel plant.
How much CO₂ does U. S. Steel Košice steel plant emit?
The page uses about 5,155,752 t CO₂e/year from the open dataset It ranks #1 among facilities in Slovakia by estimated CO₂.
Where is U. S. Steel Košice steel plant located?
U. S. Steel Košice steel plant is in Slovakia at approximately 48.61808, 21.20077.
Who operates U. S. Steel Košice steel plant?
The operator recorded in the open dataset is US Steel Košice sro.