Sv Juraj Cement Plant — Croatia
Cement Plant in Croatia. Approximate location 43.54069, 16.44131.
Cement PlantCroatiaCO₂ estimate (modelled)
Sv Juraj Cement Plant is a cement plant in Croatia. Its listed capacity is 2,100,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by CEMEX Hrvatska dd. It emits about 954,062 t CO₂e a year from Climate TRACE. That is 42% of the CO₂e from the 8 facilities in Croatia that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 25% above the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438483.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Souselas Cement Plant · 953,806 t CO₂e/yr · Portugal
- UltraTech Pali Cement Plant · 954,580 t CO₂e/yr · India
- Ube Industries Ube Cement Plant · 956,906 t CO₂e/yr · Japan
- Apo Cement City of Naga Cement Plant · 957,665 t CO₂e/yr · Philippines
- Tepezala Cement Plant · 958,527 t CO₂e/yr · Mexico
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Djale Hydroelectric Power Plant Croatia · Hydro · 41 MW · 22 km
- Zakucac Hydroelectric Power Plant Croatia · Hydro · 538 MW · 23 km
- Peruca Hydroelectric Power Plant Croatia · Hydro · 60 MW · 31 km
- Orlovac Hydroelectric Power Plant Croatia · Hydro · 237 MW · 31 km
- Kraljevac Hydroelectric Power Plant Croatia · Hydro · 46 MW · 38 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 2,100,000 t of cement, Sv Juraj Cement Plant is around the median cement plant in Croatia (2,100,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 954,062 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 954k t CO₂e/yr (Scope 1), Sv Juraj Cement Plant carries €81.4M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.
Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by CEMEX Hrvatska dd. All facilities by this operator →
Local climate
Sv Juraj Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 43.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1360 W/m² to ambient — roughly 1.05× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Sv Kajo Cement Plant · Cement Plant · 178,049 t CO₂
- INA Group Sisak Refinery · Refinery
- Kutina Fertilizers Complex · Chemical Plant · 176,220 t CO₂
- Drvenjača d.d. Pulp Mill · Pulp & Paper Mill · 11,498 t CO₂
- INA Group Rijeka Refinery · Refinery · 561,413 t CO₂
Location
Coordinates 43.54069, 16.44131. View on OpenStreetMap.
Frequently asked questions
What type of facility is Sv Juraj Cement Plant?
Sv Juraj Cement Plant is a cement plant in Croatia. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for Sv Juraj Cement Plant?
The open dataset lists 2,100,000 t of cement of capacity for Sv Juraj Cement Plant.
How much CO₂ does Sv Juraj Cement Plant emit?
The page uses about 954,062 t CO₂e/year from the open dataset It ranks #1 among facilities in Croatia by estimated CO₂.
Where is Sv Juraj Cement Plant located?
Sv Juraj Cement Plant is in Croatia at approximately 43.54069, 16.44131.
Who operates Sv Juraj Cement Plant?
The operator recorded in the open dataset is CEMEX Hrvatska dd.
