Steel PlantNigeriaStatus: mothballed (GEM)

Premium Steel Warri plant is a steel plant in Nigeria. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Premium Steel and Mines Ltd.

0reported capacity — the source does not distinguish closed or idle; treat as historical/unverified
1,000kt steel/yr (Global Energy Monitor)
mothballedasset status (Global Energy Monitor)

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567312.

Data status

Known source data

FacilityPremium Steel Warri plant Climate TRACE
CountryNigeria Climate TRACE
Coordinates5.48229, 5.77017 Climate TRACE
Sector / subsectoriron-and-steel Climate TRACE
Owner / operatorPremium Steel and Mines Ltd Climate TRACE
GEM steel parentunknown Global Energy Monitor
Steel process routeintegrated DRI Global Energy Monitor
Steel asset statusmothballed Global Energy Monitor
Steel equipmentDRI, EAF Global Energy Monitor
Steel capacity1,000 ktpa Global Energy Monitor

Calculated from the dataset

Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

Operator

Operated by Premium Steel and Mines Ltd.

Local climate

Premium Steel Warri plant sits in a tropical monsoon climate zone (Köppen Am), at 5.5°N in the northern hemisphere.

~26°Ctypical annual mean
~28°Ctypical warm-season
Tropical monsoon: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
42/100environmental-severity index
3.2°Cseasonal temperature swing
63 kmdistance to coast
HighCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1236 W/m² to ambient — roughly 0.95× the loss at a 20 °C reference; removable insulation recovers about 1174 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates 5.48229, 5.77017. View on OpenStreetMap.

Heat loss & insulation profile

For a steel plant, the main modular-insulation targets are reheat & annealing furnaces, ladles, hot-blast stoves, steam & gas ducting. Typical hot-surface ranges used for screening: 200–1,200 °C.

Indicative recoverable energy

A first-pass insulation screen suggests about 6,200 MWh/year of recoverable heat-loss reduction and about 2,100 t CO₂e/year of avoided emissions. Indicative range based on typical exposed hot equipment for this sector.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

External climate finance your country can access

For energy-efficiency projects around process heat, likely external funding channels include:

CBAM. Exporters of cement, steel, aluminium, fertiliser, hydrogen and electricity to the EU face the Carbon Border Adjustment Mechanism — cutting embedded emissions (efficiency + insulation) lowers the levy.

Sources: country climate-finance facilities and public development-bank programmes.

Frequently asked questions

What type of facility is Premium Steel Warri plant?

Premium Steel Warri plant is a steel plant in Nigeria. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

Where is Premium Steel Warri plant located?

Premium Steel Warri plant is in Nigeria at approximately 5.48229, 5.77017.

Who operates Premium Steel Warri plant?

The operator recorded in the open dataset is Premium Steel and Mines Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.