Home / Asia / Laos / Cement plants / Oudomxay Jiangge Namor Cement Plant

Oudomxay Jiangge Namor Cement Plant

Cement Plant in Laos. Approximate location 20.88359, 101.78412.

Cement PlantLaosCO₂ estimate (modelled)

Oudomxay Jiangge Namor Cement Plant is a cement plant in Laos. Its listed capacity is 1,650,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Oudomxay Jiangge Cement Sole Co Ltd. By capacity it ranks #3 among 3 cement plants in Laos. It emits about 677,240 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 158k passenger cars. Its CO₂ per unit of capacity is 13% above the national median for this sector.

1,650,000t of cement
677,240t CO₂e / yr (Climate TRACE)
#4CO₂ rank in Laos
0.41t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547338.

Data status

Known source data

FacilityOudomxay Jiangge Namor Cement Plant Climate TRACE
CountryLaos Climate TRACE
Coordinates20.88359, 101.78412 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity1,650,000 t of cement Climate TRACE
Owner / operatorOudomxay Jiangge Cement Sole Co Ltd Climate TRACE
Modelled CO₂e677,240 t/yr Climate TRACE

Calculated from the dataset

Laos rank#3 of 11 · top 27.3% calculated
Global cement rank#815 of 2113 · top 38.6% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

In context: how this facility compares

At 1,650,000 t of cement, Oudomxay Jiangge Namor Cement Plant is around the median cement plant in Laos (1,650,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 677,240 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

158kcars driven for a year
88khomes' annual energy use
11 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 677k t CO₂e/yr (Scope 1), Oudomxay Jiangge Namor Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 677k t at the EU CBAM rate (€75/t) is €51.0M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈14k t–34k t/yr, worth €1.0M€2.6M, with payback up to 2 years. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

677k t CO₂e / yrScope 1 emissions
€51.0M/yrCBAM exposure on EU exports
14k t–34k t/yr ≈ €1.0M€2.6MDecarbonization potential

Carbon price: EU CBAM €75/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Capacity vs largest cement plants in Laos

Lao Cement Ban Nadou Cement Plant: 1,900,000 t of cement1.9MLao Cement…Hongshi Hin Huep Cement Plant: 1,650,000 t of cement1.7MHongshi Hi…Oudomxay Jiangge Namor Cement Plant: 1,650,000 t of cement1.7MOudomxay J…

Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Oudomxay Jiangge Cement Sole Co Ltd.

Local climate

Oudomxay Jiangge Namor Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 20.9°N in the northern hemisphere.

~19°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical (dry winter): warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.

C3ISO 9223 corrosivity (indicative)
33/100environmental-severity index
7.9°Cseasonal temperature swing
452 kmdistance to coast
ModerateCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1267 W/m² to ambient — roughly 0.97× the loss at a 20 °C reference; removable insulation recovers about 1204 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #3 largest of 3 cement plants in Laos by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 20.88359, 101.78412. View on OpenStreetMap.

Heat loss & insulation profile

For a cement plant, the main modular-insulation targets are rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves. Typical hot-surface ranges used for screening: 200–1,000 °C.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

A first-pass insulation screen suggests about 12,000 MWh/year of recoverable heat-loss reduction and about 4,100 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

External climate finance your country can access

For energy-efficiency projects around process heat, likely external funding channels include:

Sources: country climate-finance facilities and public development-bank programmes.

Frequently asked questions

What type of facility is Oudomxay Jiangge Namor Cement Plant?

Oudomxay Jiangge Namor Cement Plant is a cement plant in Laos. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Oudomxay Jiangge Namor Cement Plant?

The open dataset lists 1,650,000 t of cement of capacity for Oudomxay Jiangge Namor Cement Plant.

How much CO₂ does Oudomxay Jiangge Namor Cement Plant emit?

The page uses about 677,240 t CO₂e/year from the open dataset It ranks #4 among facilities in Laos by estimated CO₂.

Where is Oudomxay Jiangge Namor Cement Plant located?

Oudomxay Jiangge Namor Cement Plant is in Laos at approximately 20.88359, 101.78412.

Who operates Oudomxay Jiangge Namor Cement Plant?

The operator recorded in the open dataset is Oudomxay Jiangge Cement Sole Co Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.